26.834333235733194
81.03233886311948
Project consist of Apartment, so demarcation not needed.
Brickwork boundary wall with Height of 8ft will be made.
Heavy duty interlocking tiles will be installed on driveway as per specifications.
There is no requirement of footpath along the campus.
Overhead tank will be providedon terrace and underground tank will be constructed.
Centralaised STP will be constructed, where all flats sewer will be collected and treatment will be done.
Sauces Drains will be provided all around the building and PVC pipes will be used for other drainage purpose.
open area provided can be used as a park.
Planting of trees will be done all around campus.
Electrical system has been designed as per norms of Local Electricity Board following all measure and capacity.
There is not any requirement of Community Building.
STP will be constructed for treatment of sewage.
Garbage collection place will be allocated, from where garbage will be collected by concern agency.
Rainwater system will be there to conserve the rain water and the same can be used for multiple purpose.
LED lights and solar light will be installed on external area for energy conservation.
All fire protection and fire safety system will be desined as per NBC, considering the building height, which is less than 50 m.
N.A.
Emergency plan will be explained and plan will be placed in building for ease of understanding.
Miscllaneous will be done accordingly.
Showing 1 blocks with 133 units
Total Area
61430.75 m²
661234.45 ft²
Total Units
829
3 different types
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
59.66 m²
642.15 ft²