Project Area
Launch Date
Completion Date
RERA ID
26 46 30.4 N
80 54 12.8 E
YES
YES
INTERNAL DRIVEWAY IN PROGRESS, WELL CONNECTED TO EXTERNAL 24 MT ROAD
IN PROGRESS
SUPPLY FROM RCC WATER TANK FROM TERRACE TO EACH FLAT
CONNECTED TO EXISTING TRUNK SEVER LINE
THROUGH EXTERNAL DRAIN
YES
YES
YES
NO
CONNECTED TO EXISTING TRUNK SEVER WHICH IS FINALLY DISPOSED TO STP
THROUGH PRIVATE VENDOR
YES
NO
YES
NEARBY DEVELOPED SCHEME
YES
PASSENGER AND CARGO LIFT, TELEPONE CONDUITING LINE
No: SANCTION COPY OF PROJECT( IN DEVELOPED LDA MANSAROVER SCHEME) | Date: 22-08-2015
Showing 3 blocks with 18 units
Total Carpet Area
13831.60 m²
148881.96 ft²
Total Units
178
2 different types
Blocks & Floors
3
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9802.00 m²
105507.75 ft²