Launch Date
Completion Date
RERA ID
28.572091
77.481905
As per lease plan
Brick work and permanent furnishing on boundary wall
Cement concrete road with laying of pavers on top
R.C.C and as per landscape architect plan
underground tank of adequate capacity, overhead tanks in each tower, drinking water supply by GNIDA and as per M.E.P consultant
Design sewer system with hume pipes and as per M.E.P consultant
Drain system as per M.E.P consultant drawing
As per landscape consultant
Sufficient plantation as per landscape consultant
As per consultant drawing uploaded & services approved by M.E.P consultant
Club house as per plan
STP provided as per EC norms and M.E.P consultant
As per consultant drawing sewerage system planned garbage recycle machine as per M.E.P consultant
Rain water harvesting pits as per drawing issued by the consultant
Led light in common area
Manual fire alarm system as per N.B.C and as per provisional sanction
Amphitheatre ,club, swimming pool etc.
Staircase in each tower as per sanction plan
Commercial space within complex
Showing 12 blocks with 818 units
Total Carpet Area
54165.18 m²
583028.58 ft²
Total Units
980
3 different types
Blocks & Floors
12
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20240.00 m²
217861.34 ft²