NewActive

ANTARA NOIDA PHASE 1

Gautam Buddha Nagar, Uttar Pradesh
01-07-2020
Launch Date
New
Type
16-06-2025
Completion Date

Overview

Project Area

4.0804 acres

Launch Date

01-07-2020

Completion Date

16-06-2025

RERA ID

UPRERAPRJ745377

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)16513
Project NameANTARA NOIDA PHASE 1
Registration Fee (in Rs.)88000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-07-2020
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)57500
Proposed Completion Date16-06-2025

Location

Latitude

28 25 46. 70

Longitude

77 28 56. 68

Brochures

Bank Details

Account no.919020087618746
Name Of Account HolderCONTEND BUILDERS PRIVATE LIMITED (RERA ACCOUNT)
Bank NameAxis Bank
Branch AddressUpper Ground Floor And First Floor 40 B 2b Block Sector 1 Noida 201301
Branch NameSec-1, Noida
IFSC CodeUTIB0002951

Development Works

Demarcation of Plots

The plot will be demarcated as per sanctioned drawing

Boundary Wall

Boundary wall will be as per Masterplan of the Sports City

Road Work

Access Road to all the Residences will be provided and roads will be designed to take up live loads as per approvals

Footpaths

Designated Pedestrian footpath will be created around the site to access different facilites of the project

Water Supply Including Drinking Water Facilities

Municipal Water supply will be provided. This water supply will be treated first before being supplied to domestic water tanks

Sewer System

Centralised STP is provided to treat the sewage

Drain

Stormwater drains will be provided

Parks

As per Master plan of the Sports City

Tree Planting

As per Master plan of the Sports City

Design For Electric Supply Including Street Lighting

Power Supply from Noida Electricity Board and street lighting as per approved building plan

Community Buildings

Club with all facilites and amenties is provided as per approved building plan

Treatment and Disposal System of Sewage and Sullage water

Centralised STP

Solid Waste Management And Disposal System

Collection, Storage and Disposal will be done as per MOEF requirements

Water Conservation System

Rain Water harvesting System, Dual Flush System,

Energy Management System Including Use of Renewable Energy

Usage of LED Lights and Use of Solar Water heaters for Kitchens

Fire Protection And Fire Safety System

As per approved building plans

Social Infrastructure And Other Public Amenities Including Public Health Services

Social gathering places are provided in the club and in the landscape areas

Emergency Evacuation Services

As per approved building plans and fire approvals

Other Miscellaneous Work

As per approved building plan

Documents

Lease Deed

No: 4997 | Date: 04-05-2013

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 30-12-2019

Commencement Certificate

Uploaded: 24-12-2019

Other Plan(If Any)

Uploaded: 24-12-2019

Proforma of Application Form

Uploaded: 24-12-2019

Proforma of Allotment Letter

Uploaded: 24-12-2019

Proforma of Conveyance Deed

Uploaded: 02-01-2020

Waste Disposal Plan

Uploaded: 30-12-2019

Water Supply Plan

Uploaded: 24-12-2019

Electricity Supply Plan

Uploaded: 24-12-2019

Development Work Plan

Uploaded: 24-12-2019

Affidavit

Uploaded: 30-12-2019

ENGINEERS CERTIFICATE

Uploaded: 30-12-2019

Permits

Orignal Permit NoNOIDA/MVN/2019/IV-1532/1157
Orignal Permit Date18-12-2019
Valid Upto17-12-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-12-2027
End Date17-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No-
Orignal Permit Date01-01-1900
Valid Upto17-12-2024
Revalidated Permit NoNOIDA/MVN/2019/IV-1532/1157
Revalidated Permit Date18-12-2019
Revalidated Permit Valid Upto17-12-2024
Permit Extendable Upto17-12-2027
End Date17-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SS CONSTRUCTION CO.
Contractor AddressS.C.O. 375, IInd FLOOR SECTOR 37-D, CHANDIGARH
Architect NameDesign forum International
Architect AddressK-47 GREATER KAILASH NEW DELHI-110048
Architect Licence NumberCA/2007/39854
Structural Engineer NameAjay Sahni
Structural Engineer AddressS-13/25 Ground Floor,DLF Phase-III, Gurgaon Haryana-122002
Mobile number(Project Co-ordinator)9810402975

Land Details

AFS

Showing 3 blocks with 154 units

Property Summary

Total Carpet Area

41667.36

448503.30 ft²

Total Units

340

3 different types

Blocks & Floors

3

34 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:122.55
Balconies:282
Parking ratio:0.00 per unit

Block RESIDENCE 1

34 units

Block RESIDENCE 2

60 units

Block RESIDENCE 3

60 units

Khasra Details

Total Area

32372.90

348458.66 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-01/B-1 SECTOR 150 NOIDA
Area(In Sq. Mt.)32372.90

Other Details

Contractor Name (if any)SS CONSTRUCTION CO.
Contractor AddressS.C.O. 375, IInd FLOOR SECTOR 37-D, CHANDIGARH
Architect NameDesign forum International
Architect AddressK-47 GREATER KAILASH NEW DELHI-110048
Architect Licence NumberCA/2007/39854
Structural Engineer NameAjay Sahni
Structural Engineer AddressS-13/25 Ground Floor,DLF Phase-III, Gurgaon Haryana-122002
Mobile number(Project Co-ordinator)9810402975