Project Area
Launch Date
Completion Date
RERA ID
26.798611
80.845278
Demarcation of plots will be done after the development work will be completed
No boundary wall is propsoed
Road will be constructed as per sanction layout plan. Earth filling work sub grade preparation GSB 200 mm laying and final premix carpet will be done in stepwise development work.The roads in sector 07 has been designed with varying width 12,18 & 9m. Pathways, Cycle Track, are provided to enhance mobility
The footpath will be developed with interlocking tiles and electric trench will run through footpath. The footpath will be 1.2mtrs to 1.8 mtrs as per road width.
The water will be supplied through borewell and Overhead Tanks and UG Tanks for commercial tanks. The diameter of the water pipeline is 100mm to 250mm as per population and load demand.
The provision of seweage chamber for sector -06 to manage waste water efficiently. The diameter of sewage pipe is 200mm to 800mm as per population. The material of pipe is DWC SN8.
Surafce drain is of RCC and the diameter is 300mm to 1200mm and depth is 300mm to 1800mm
Parks will be developed as per sanction layout and the parks will have brick walls of height 5ft as per design
Landscaping & Tree Plantation on green belts along roads and parks to create a greener, healthier & more pleasant environment.
Electric work is proposed including street light on each external road through electric pole. Street Lighting is provided for the road visibility. The main substation is 220/33KV and second tier substation is 33/11 KVA and sectoral 11/.433 KV substation.
A area of 3870.25Sqm 6/COM-01 is provided for community Buildings
It Has been provided on the sector-08
A Big plot Has been provided for garbage of entire sector will be collected in sector-01 and A garbage plot has been provided for each sector.
Rain water harvesting pits are provided on the parks.
100% Led Lighting Considered Instead Of Cfl Or Incandescent Lamps,Provision Of Minimum 3 Star Rated Electrical Equipments,Provision Of Energy Management Strategy & Analysis Provisions With Multifunction Meters Compatible With Scada,Considering 2 % Voltage Drop For Power Distribution In Lt & 4% In Ht,Plug In Provision In Feeder Panels For Other Renewable Sources To Reduce Distribution Losses ,Astronomical & Timer Based Switching For Street Lighting
1 FIRE STATION plot has been provided for sector 6 and 7. the area of 7/FS-01= 1978.00 Sqm is provided.
Area reserved for such amenities are demarcated in the sanction layout
NA
NA
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
127761.00 m²
1375206.63 ft²