WE HAVE RESIDENCIAL AREA OF SIZE 61885.16 SQMT HAVING , 2 MAIN ENTRANCE AND 1 EXIT GATE FROM THE 45M WIDE FRONT ROD.
THE M30 RCC WALL WITH GRILL OF HIGH 1.8 M WILL BE CONSTRUCTED ALONG THE PERIPHARY OF THE PLOT.
THE INTERNAL ROADS WILL BE CONSTRUCTED AS PER THE SANCTION PLAN HAVING 6M WIDTH. THE ROAD WILL BE MADE OFF RCC/PAVERS. THE THICKNESS OF RCC ROAD WILL BE 150MM AND M30 GRADE. THE EXTERNAL ROAD IS ALREADY CONSTRUCTED BY LDA
THE FOOTHPATH OR OTHER PUBLIC CARES SHALL BE CONSTRUCTED AS OER THE LANDSCAPE PLANS. THE FOOTPATH SHALL BE MADE OF RCC/CHECKERRED TILES/PAVERS/GRAVEL. THE WIDTH OF FOOTHPATH SHALL BE AS PER THE LANDSCAPING PLAN.
THE INTERNAL DISTRIBUTION OF WATER SUPPLY UPTO THE PUMPING STATION. UNERGROUND STORAGE , PUMPING TO OVERHEAD TANKS SHALL BE DONE BY US. THE WATER SUPPLY LINES SHALL BE MADE OF PVC, CPVC AND GI . THE UGT AND OHT OF REQUIREDCAPACITY SHALL BE CONSTRUCTED BY RCC M30 GRADE. THE WATER SUPPLY DISTRIBUATION FROM TO OHT TO INDIVIDUAL PLOTS SHALL BE DONE WITH UPVC/CPVC WITH PRV. THE SEPRATE SYSTEM OF DISTRIBUTION OF RECYCLED WATER WILL BE DONE WITH UPVC PIPES
THE INTERNAL COLLECTION OF SEWAGE SHALL BE DONE THROUGH RCC SEWER LINES WITH MANHOLES AT REQUIRED DISTANCE . THISSEWAGE WILL BE FURTHER TREATEDIN THE STP. THE TREATED WATER FROM STP SHALL BE USED FOR LANDSCAPING AND FLUSHING PURPOSE. THE EXCESS OF TREATED WATER IF ANY SHALL BE DISPOSED IN MUNICIPAL SEWER SYSTEM . THE STP WILL BE BASED ON MBBR TECHNOLOGY.
THE STORM WATER DRAIN SHALL BE CONSTRUCTEDAS PER THE DRAINAGE PLAN AND DISPOSED IN MUNICIPAL DRAIN PROVIDED BY LDA. THE RAIWATER SHALL BE COLLECTED AND WILL BE USED TO RECHARGE UNDERGROUND WATER.
THE PARK AND PUBLIC AREA WILL BE DEVELOPED AS PER THE LANDSCAPING PLAN WITH VARIOUS PUBLIC AMENITIES CHILDREN PLAY. AREA , ELDERLY SITTING, JOGGING TRACK, YOGA SPACES , OUTDOOR GYM ETC. THE LOCAL PLANTS WILL BE USED ALONG THE BOUNDARY WALL. THE VARIOUS SHRUBS AND PLANTS WILL BE PLANTED THROUGH OUT THE LANDSCAPING ACCORDING TO LAND SCAPING PLAN.
THE TRESS WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECTS AND ALONG THE BOUNDARY WALLS.
ELECTRCI LAYOUT AND CAPACITY WILL BE INSTALLED TO SUFFICE THE DOMESTIC USE. ALL ELECTRIC CABLING WILL BE UNDERGROUND AND STREETLIGHTS WILL BE AS PER LAYOUT WORKING DRAWING.
NA
THE ENTIRE SEWER WATER WILL BE TREATED IN STP (MBBR TECHNOLOGY) AND TREATED WATER SHALL BE USED FOR IRRIGATION AND FLUSHING PURPOSE . REST TREATED WATER WILL BE DISPOSED IN MUNICPAL SEWAGE LINE.
DOOR TO DOOR SOLID WASTE WILL BE COLLECTED FROM ALL RESIDENTIAL PLOTS. THE ORGANIC PORTION OF WASTE WILL BE COMPOSTED AT SITE IN OWC AND TREATED MANURE WILL BE USED FOR LANDSCAPE PURPOSE . THE OTHER WASTE WILL BE SOLD TO AUTHORISED RECYCLE AGENTS.
RAIN WATER WILL BE COLLETEC AND USED IN INDERGROUND WATER TABLE RECHARGINGTHROUGH RAIN WATER HARVESTING SYSTEM. A PART FROM THIS, LOW FLOW SANITARY FIXTURES WILL BE USE TO SAVE FRESH WATER.
WE WILL BE USEING ENERGY EFFICENT LIGHT FIXTURE, ELECTRIC PUMPS TO SAVE ELECTRICITY , ALSO SPECIAL GLASS WILL BE USE TO MINIMUM HEAT IN HOMES, RESSULTING LOAD IN AC SYSTEMS. A SOLAR SYSTEM WILL ALSO BE INSTALLEDFOR OPEN AREA LIGHTING.
NA
OPEN GYM, POOLS, YOGA AREA , SPORTS PLAY AREA, GARDEN SITTING ETC.
NA
ITS GATED HAVING FULL SECURITY , CCTV CAMERAS , SUPPORT FACILITIES WITH POWER BACKUP SYSTEM, STP, OWC ETC.
Showing 1 blocks with 6 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
61885.00 m²
666123.95 ft²