NewActive

Akhilesh Plaza

Moradabad, Uttar Pradesh
05-10-2021Launch Date
NewType
UPRERAPRJ415630/08/2024RERA ID
04-10-2026Completion Date

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)2701
Project NameAkhilesh Plaza
Registration Fee (in Rs.)38000
AddressGata No: 48, Moja Manpur Narayanpur Almaroof Arya Nagar Station road Budh Bazar Moradabad 244001
Village/Locality/Sector etc.Moja Manpur Narayanpur Almaroof Arya Nagar Station road Budh Bazar
StateUttar Pradesh
Project Duration (In month)60
DistrictMoradabad
Original Start Date-
TehsilMoradabad
Proposed Start Date05-10-2021
Sanctioning Competent AuthorityMoradabad Development Authority
Project Cost (in Lacs)3302
Proposed Completion Date04-10-2026

Location

Latitude

28.83389

Longitude

78.77175

Bank Details

Account Details
Name of the AccountInderjeet Singh Chadha Collection A/C for Akhilesh Plaza
Account Number42725794587
Bank NameState Bank of India
Branch NameCivil Lines
Branch AddressSBI, Civil Lines, DT, Moradabad 244001
IFSC CodeSBIN0004113
Branch DistrictMoradabad
Branch StateSelect
Branch Email Addresssbi.04113@sbi.co.in
Separate Account Details
Name of the AccountInderjeet Singh Chadha Separate A/C for Akhilesh Plaza
Account Number42725789544
Bank NameState Bank of India
Branch NameCivil Lines
Branch AddressSBI, Civil Lines, DT, Moradabad 244001
Branch StateUttar Pradesh
Branch DistrictMoradabad
IFSC CodeSBIN0004113
Transaction Account Details
Name of the AccountInderjeet Singh Chadha Transaction A/C for Akhilesh Plaza
Account Number42725863280
Bank NameState Bank of India
Branch NameCivil Lines
Branch AddressSBI, Civil lines, DT, Moradabad 244001
Branch StateUttar Pradesh
Branch DistrictMoradabad
IFSC CodeSBIN0004113

Development Works

Demarcation of Plots

As per approved layout plan we have total 2701.64 sq. meter plot area, in which there will be one main entrance gate with one exit gate. Site is connected with 24 meter wide main road in front connected with station road

Boundary Wall

1.8 - 2.1 m high and 200 mm thick boundary wall designed in this project with MS railing as per approved plan. Brick work of 9 inches and RCC work in column and beam will be used and gates will be made of MS steel.

Road Work

Trimix / Asphalt model road will be used in this project which is design by architect.

Footpaths

All internal roads will have narrow footpaths with tiles pavers or equivalent finish.

Water Supply Including Drinking Water Facilities

All floors are connected and equipped with domestic water for sanitary activities and STP treated water for flushing system. The STP treated water will also be made available for other purposes

Sewer System

This building will equipped with centralized sewerage system for ensuring all sewerage water is directed to the sewerage treatment plan for thourough treatment.

Drain

A storm water system will be used to manage storm water from road and other landscape areas. The storm water will be directed to the storm water channel while roof top storm water will be channel to a rain water harvesting PIT.

Parks

IN this project there will be no park available

Tree Planting

as per approved layout plan in this project 38 trees are proposed to plant

Design For Electric Supply Including Street Lighting

We have designed the system as per local electircity board and consider one centralized transformer panel, LT panel, Feeder Pillar, and DG back for common service like external lights, pump room etc.

Community Buildings

In this project there will no community building

Treatment and Disposal System of Sewage and Sullage water

There will be centralized sewerage system and all floors are connected to STP. All sewerage water will go to STP for treatment after treatment water will be recycled and used for other purposes

Solid Waste Management And Disposal System

This project will have one waste segregation area and solid waste will be encouraged to segregation with all floors, dustbin will also be provided for collection of waste and there will a proper collection agency who collect all waste.

Water Conservation System

A well designed rain water harvesting system will be there in this project to recharge PIT.

Energy Management System Including Use of Renewable Energy

The main aim in this project is envisioned as green sustainable building and resource efficiency throughout the building and to conserve natural resources and implemented to optimize energy efficient system and machinery

Fire Protection And Fire Safety System

All fire norms will be followed as per approval from fire department fire sprinklers smoke detectors with pump are being used in this project

Social Infrastructure And Other Public Amenities Including Public Health Services

There will be no social infrastructure in this project

Emergency Evacuation Services

Fire staircase will be provided in this project on each floors there will be fire resistance doors and basement will have one access and exit in case of emergency and dedicated assemble area also be there

Other Miscellaneous Work

NA

Documents

Registry Document

No: 4878 | Date: 17-07-2001

Registry Document

No: 4879 | Date: 17-07-2001

Registry Document

No: 4274 | Date: 06-05-2005

Registry Document

No: 3557 | Date: 13-04-2005

Allotment Letter issued by Competent Authority

No: 293 | Date: 04-08-2020

Registry Document

No: 25725 | Date: 14-07-2022

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 26-06-2024

Commencement Certificate

Uploaded: 29-05-2024

Other Plan(If Any)

Uploaded: 29-05-2024

Proforma of Application Form

Uploaded: 29-05-2024

Proforma of Allotment Letter

Uploaded: 29-05-2024

Proforma of Conveyance Deed

Uploaded: 29-05-2024

Waste Disposal Plan

Uploaded: 29-05-2024

Water Supply Plan

Uploaded: 29-05-2024

Electricity Supply Plan

Uploaded: 29-05-2024

Development Work Plan

Uploaded: 29-05-2024

Affidavit

Uploaded: 29-05-2024

CA CERTIFICATE

Uploaded: 29-05-2024

ARCHITECT CERTIFICATE

Uploaded: 29-05-2024

ENGINEERS CERTIFICATE

Uploaded: 29-05-2024

Other

Uploaded: 29-05-2024

Proforma of Agreement for Sale

Uploaded: 29-05-2024

Permits

Orignal Permit NoMBDA/BP/20-21/0125
Orignal Permit Date05-10-2021
Valid Upto04-10-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto04-10-2026
End Date04-10-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Malik and Associates
Contractor Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Architect NameR. K. Malik
Architect Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Architect Licence NumberCA/92/14653
Structural Engineer NameUma Kanth Verma
Structural Engineer Address18, Mansarovar Colony, Moradabad 244103
Mobile number(Project Co-ordinator)9821128428

Land Details

AFS

Showing 1 blocks with 7 units

Property Summary

Total Area

2104.04

22647.68 ft²

Total Units

101

2 different types

Blocks & Floors

1

7 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:20.83
Balconies:0
Parking ratio:0.00 per unit

Block Akhilesh Plaza

7 units

Khasra Details

Total Area

2701.64

29080.18 ft²

1 plot
Plot
TypePlot
Khasra/Plot No48
Area(In Sq. Mt.)2701.64

Other Details

Contractor Name (if any)Malik and Associates
Contractor Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Architect NameR. K. Malik
Architect Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Architect Licence NumberCA/92/14653
Structural Engineer NameUma Kanth Verma
Structural Engineer Address18, Mansarovar Colony, Moradabad 244103
Mobile number(Project Co-ordinator)9821128428