Project Area
Launch Date
Completion Date
RERA ID
28....43....10.74
77...44...56.63
PLOTS ARE DEMARCATED
NOT NEEDED
MOSTLY ZONAL ROADS ARE COMPLETED WHERE AS THE INTERNAL ROADS IN SOME BLOCKS HAVE TO BE COMPLETED .
SAME AS ABOVE
ALMOST TRUNK WATER SUPPLY LINES ARE LAID IN THE WHOLE SCHEME AND OVERHEAD TANK HAVE BEEN CONSTRUCTED AND INTERNAL WATER LINES IN SOME BLOCKS HAVE TO BE LAID.
SAME AS ABOVE
ALMOST TRUNK DRAINS HAVE BEEN CONSTRUCTED IN THE WHOLE SCHEME AND IN FEW BLOCKS INTERNAL DRAINS HAVE TO BE CONSTRUCTED .
MAIN PARKS HAVE BEEN COMPLETED AND FEW PARK IN DIFFERENT BLOCKS HAVE TO BE COMPLETED.
ALMOST DONE
STREET LIGHTING ALMOST COMPLETED ON MAIN ROADS WHERE AS IN FEW BLOCKS HAS TO BE COMPLETED
CONSTRUCTED
TRUNK SEWER LINES WILL BE CONNECTED TO STP
WILL BE ESTABLISHED
RAIN WATER HARVESTING SYSTEM WILL BE CONSTRUCTED
SUBSTATION HAS BEEN COMPLETED AND IS OPERATIONAL
WILL BE INSTALLED AS PER REQUIREMENT
PLOTS HAVE BEEN DEMARCATED
WILL BE INSTALLED AS PER REQUIREMENT
WILL BE INSTALLED AS PER REQUIREMENT
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1525488.00 m²
16420200.28 ft²