OngoingActive

Aadyant Phase-3

Lucknow, Uttar Pradesh
24-12-2013Launch Date
OngoingType
UPRERAPRJ3410RERA ID
16-09-2018Completion Date

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)830
Project NameAadyant Phase-3
Registration Fee (in Rs.)8300
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)57
DistrictLucknow
Original Start Date24-12-2013
TehsilLucknow
Proposed Start Date24-12-2013
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)192
Proposed Completion Date16-09-2018

Location

Latitude

26 48 25.5

Longitude

81 00 39.48

Bank Details

Account no.50200021015007
Name Of Account HolderPAARTH INFRABUILD PVT LTD
Bank NameHDFC Bank
Branch AddressPlot No. 120, Patparganj Industrial Area, New Delhi-110092
Branch NameHDFC BANK Limited
IFSC CodeHDFC0002840

Development Works

Demarcation of Plots

As per approval from competent authority

Boundary Wall

As per approved plan

Road Work

Cement Concrete/Bituminous Road Network

Footpaths

As per Bye-Laws

Water Supply Including Drinking Water Facilities

Water supply as per requirement provided

Sewer System

Provision as per bye-laws

Drain

Provision as per bye-laws

Parks

Provided as per approved plan

Tree Planting

Provision as per bye-laws

Design For Electric Supply Including Street Lighting

Provision as per bye-laws

Community Buildings

As per approved plan

Treatment and Disposal System of Sewage and Sullage water

Provision as per bye-laws

Solid Waste Management And Disposal System

Provision as per bye-laws

Water Conservation System

Provision as per bye-laws

Energy Management System Including Use of Renewable Energy

Provision as per bye-laws

Fire Protection And Fire Safety System

Provision as per bye-laws

Social Infrastructure And Other Public Amenities Including Public Health Services

Provision as per bye-laws at township level

Emergency Evacuation Services

Provision as per bye-laws

Other Miscellaneous Work

All necessary facilities provided as per bye-laws

Documents

Extract of Khatauni

No: 1418-1423 | Date: -

Electricity Supply Plan

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Other Plan(If Any)

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 05-04-2019

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 06-07-2018

Affidavit

Uploaded: 06-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Affidavit

Uploaded: 28-07-2017

Registry Document In Case of Own Land

Uploaded: 13-10-2017

Commencement Certificate

Uploaded: 13-10-2017

Commencement Certificate

Uploaded: 13-10-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Floor plans of all types

Uploaded: 13-10-2017

Other Plan(If Any)

Uploaded: 13-10-2017

Affidavit

Uploaded: 19-12-2017

Permits

Orignal Permit No349996
Orignal Permit Date06-06-2013
Valid Upto05-06-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-06-2021
End Date16-09-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No38814
Orignal Permit Date21-09-2015
Valid Upto20-09-2020
Revalidated Permit No38814
Revalidated Permit Date21-09-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto20-09-2023
End Date16-09-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/s. Rudrabhishek Enterprises (P) Ltd.
Contractor AddressA-6, Sector-58, Noida,U.P.
Architect NameM/s. Rudrabhishek Enterprises (P) Ltd.
Architect AddressA-6, Sector-58, Noida,U.P.
Architect Licence NumberCA/2005/35401
Structural Engineer NameM/s. Rudrabhishek Enterprises (P) Ltd.
Structural Engineer AddressA-6, Sector-58, Noida,U.P.
Mobile number(Project Co-ordinator)9643405696

Land Details

AFS

Showing 1 blocks with 7 units

Property Summary

Total Area

122.46 m²

1318.15 ft²

Total Units

10

2 different types

Blocks & Floors

1

2 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:12.25 m²
Balconies:0
Parking ratio:0.00 per unit

Block School/Shop/ATM

7 units

Khasra Details

Total Area

830.00 m²

8934.04 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No183
Area(In Sq. Mt.)630
Khasra
TypeKhasra
Khasra/Plot No184
Area(In Sq. Mt.)200

Other Details

Contractor Name (if any)M/s. Rudrabhishek Enterprises (P) Ltd.
Contractor AddressA-6, Sector-58, Noida,U.P.
Architect NameM/s. Rudrabhishek Enterprises (P) Ltd.
Architect AddressA-6, Sector-58, Noida,U.P.
Architect Licence NumberCA/2005/35401
Structural Engineer NameM/s. Rudrabhishek Enterprises (P) Ltd.
Structural Engineer AddressA-6, Sector-58, Noida,U.P.
Mobile number(Project Co-ordinator)9643405696