ONGOINGActive

RPS INFINIA PHASE III

FARIDABAD, BADKHAL
23-10-2018Launch Date
ONGOINGType
RERA-PKL-338-2018RERA ID
11270 LakhsProject Cost

Basic Details

Project NameRPS INFINIA PHASE III
Project IDRERA-PKL-338-2018
Project TypeONGOING
Applicant TypeCompany
Submission Date23-10-2018 02:28:11 AM
Builder NameRPS INFRASTRUCTURE LTD.
CINU45201DL2005PLC140779
PANXXXX288F
Emailinfo@rpsgroupindia.com
Websitehttp://www.rpsgroupindia.com
Phone (Mobile)0114054320
Phone (Landline)01140543200
Registered Address1117-1120, TOWER-B, DLF TOWERS, JASOLA DISTRICT CENTRE, NEW DELHI-110025
Project AddressVILLAGE SARAI KHAWAJA, SEC 27 A
DistrictFARIDABAD
TehsilBADKHAL

Bank Details

Bank NameORIENTAL BANK OF COMMERCE, SECTOR-16, DAULTABAD, FARIDABAD
Account Number01981131004435
IFSC CodeORBC0100198
MICR Code110022060
Branch Code0198

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Directors of the Company
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area1.68 (Acre)
Proposed FAR250
Permissible FAR15494.70
Total Licensed Land7.587 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7602.66
CONSTRUCTION OF ROADS10032
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS4147.20
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER8921.59
Total30703.45

Cost Details

Land Cost4313 Lakhs
Other Cost264 Lakhs
Estimated Project Cost11270 Lakhs
Estimated Infrastructure Cost697 Lakhs
Estimated Apartment Construction Cost5996 Lakhs

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERAS PER PROJECT REPORT
EXTERNAL FIRE FIGHTINGAS PER PROJECT REPORT
SOLID WASTE MANAGEMENT SYSTEMAS PER PROJECT REPORT
VD FLOORING, WHITE WASH & OTHER ACTIVITIES IN BASEMENTAS PER PROJECT REPORT

NOC Details

ROADSProvider: DTCP/MCF/HUDAApproval Status: Pending
WATER SUPPLYProvider: DTCP/MCF/HUDAApproval Status: Pending
ELECTRICITYProvider: DTCP/MCF/HUDAApproval Status: Pending
SEWAGE DISPOSALProvider: DTCP/MCF/HUDAApproval Status: Pending
STORM WATER DRAINAGEProvider: DTCP/MCF/HUDAApproval Status: Pending

Documents

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 23-10-2018

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 23-10-2018

DEMARCATION PLAN

Uploaded on: 23-10-2018

ZONING PLAN

Uploaded on: 23-10-2018

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 23-10-2018

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 23-10-2018

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 23-10-2018

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 23-10-2018

Statutory Approvals

BUILDING PLANDate: 11-10-2018Status: ALREADY BEEN OBTAINED

Statutory Approval Details

Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: No
ELECTRICITY SUPPLY PLANApproved: No
WATER SUPPLY PLANApproved: No
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: No
STROM WATER DRAINAGEApproved: No
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Part F Details

Gist of the important provisions of the Draft AgreementYes
A copy of the draft allotment letter by which the apartment shall be allotted/ booked in favour of the apartment buyers.Yes
A copy of the Draft Agreement which shall be made before seeking any deposit exceeding 10% of the cost of the apartment. (Based on the model agreement prescribed in the Rules)Yes

Project Team

Authorized Representative

ANSHU SINGAL
Name
ANSHU SINGAL
PAN
XXXX814L
Email
asingal@rpsgroupindia.com
Mobile
9871099601
Landline
01140543200
Address
D-16 Kamla Nagar New Delhi

Managing Director/CEO

RAKESH CHAND GUPTA
Name
RAKESH CHAND GUPTA
PAN
XXXX686R
Email
info@rpsgroupindia.com
Mobile
9871099601
Landline
01140543200
Address
946 Sector-15 Faridabad

Directors

SHANTI PARKASH
Name
SHANTI PARKASH
PAN
XXXX679G
Email
info@rpsgroupindia.com
Mobile
9871099601
Landline
01140543200
Address
399 sector-16A Faridabad

Contact Details

Project ContactEmail: ramneek@rpsgroupindia.comMobile: 9871099619Landline: 01294054320
Project Contact PersonName: B P SHARMAEmail: bpsharma@rpsgroupindia.comMobile: 8860085284Landline: 01294054320

Land Details

Land Information

Land Area1.68 (Acre)
Proposed FAR250
Permissible FAR15494.70
Total Licensed Land7.587 (Acre)
LicenseNumbers19 of 2010

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7602.66
CONSTRUCTION OF ROADS10032
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS4147.20
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER8921.59
Total30703.45

Cost Details

Land Cost4313 Lakhs
Other Cost264 Lakhs
Estimated Project Cost11270 Lakhs
Estimated Infrastructure Cost697 Lakhs
Estimated Apartment Construction Cost5996 Lakhs

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEINTERNAL FLOORING OF UNITS : TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS
WALL FINISHING DETAILSINTERNAL WALLS OF UNITS: TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: PLASTER WITH PLEASANT SHADES OF DISTEMPER
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSCHINAWARE & CHROME PLATED(CP) FITTINGS
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESFRAMELESS/UPVC/ALUMINUM FRAME
GLASS WORKGLAZED SHUTTERS/FIXED GLASS FOR INTERNAL DOORS & WINDOWS
ELECTRIC FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
CONDUCTING AND WIRING DETAILSPVC CONDUITS FOR CONCEALED WIRING AND MS CONDUITS FOR EXPOSED WIRING WITH ISI MARKED CABLES AS PER REQUIREMENT
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGEUNDER GROUND AND OVER HEAD RCC TANKS
LIFT DETAILSPASSENGER LIFTS OF SUITABLE/APPROVED CAPACITY
EXTERNAL GLAZINGSSTRUCTURE GLAZING WITH TOUGHENED GLASS IN EXTERNAL FAƧADE
WINDOWS/GLAZINGSSTRIP WINDOWS WITH TOUGHENED GLASS
DOORSGLAZED DOORS OF SPECIFIED SIZE
MAIN DOORSGLAZED DOORS OF SPECIFIED SIZE
INTERNAL DOORSGLAZED DOORS OF SPECIFIED SIZE
AIR CONDITIONINGCENTRALIZED AIR CONDITIONING THROUGH DUCTING/ SPLIT AIR CONDITIONERS
ELECTRICAL FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYTO BE PROVIDED
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL PAINT IN PLEASANT SHADE FOR AREAS OTHER THAN GLASS AND STONE CLADDING
INTERNAL FINISHINGPLASTER WITH PLEASANT SHADES OF DISTEMPER ON WALLS AND KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS IN FLOORING

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORNA
WALLSNA
CEILINGNA
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNA
WALLSNA
CEILINGNA
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:311037
cheque no:845691
draft date:29-07-2017
payable to:HRERA Panchkula
payee bank:ORIENTAL BANK OF COMMERCE