Plot boundaries as per given by AWAS Vikas authority
Temporary Steel Fencing done for construction work, Permanent Boundary wall to be provided after construction
paved roads will be provided
Pavers will be provided
Raw water will be received in under ground tank, then processed in water treatment plant and treated water stored in tanks
Under ground sewage system. Feeder pipeline of UPVC and final discharge through RCC pipes
Storm water will go to harvesting recharge pits. Excess water if any, will be discharge to authority drain.
It shall be provided as per approved plan
20 Nos of tree planting will be done as per approved plan
HT line shall be taken from UPPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based.
Club house with SPA, Gym, Swimming pool, will be provided as approved drawing.
Treatment Plant not applicable,Sewage will be discharge to authority drain
Kitchen waste collection will be collected manually. Other waste shall be manually handle for disposal.
Harvesting recharge pits shall be used. Water Filtration to be done as per requirement
Electricity to be supplied by UPPCL and further distributed as per requirements
Fire hydrant shall be provided. Fire alarm system, sprinkler, smoke detector and fire extinguisher shall be provided as required.
Retail Shops are be provied as part of commercial area to be sold separately by developers. Swimming pool, Gym, SPA shall be provided as part of the club, Common toilet, Guard Room
Fire tender route and refused areas shall be provided. Emergency Fire stairs shall be provided as approved by fire department Drawings
NIL
Showing 1 blocks with 141 units
Total Area
13626.86 m²
146678.16 ft²
Total Units
140
3 different types
Blocks & Floors
1
25 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3529.86 m²
37995.06 ft²