Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):5060
Project Name:MARINE PARK CITY
Registration Fee (in Rs.):30500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):48
District:Barabanki
Original Start Date:-
Tehsil:Nawabganj
Proposed Start Date:19-02-2020
Sanctioning Competent Authority:Any Other Competent Authority
Project Cost (in Lacs):149
Proposed Completion Date:16-02-2024

Location

Latitude

26.963840

Longitude

26.963840

Bank Details

Account no.:201002691368
Name Of Account Holder:MARINE ADVENTA ENTERPRISES
Bank Name:INDUSLND BANK
Branch Address:OBAREE,UGF AT MITRA PLAZA,OPP.DM NIVAS,BARABANKI,225001
Branch Name:OBAREE
IFSC Code:INDB000435

Development Works

Demarcation of Plots

It will be demarcated through a temporary wall.

Boundary Wall

5 FT.Height boundry wall with 3 deep eccentric foundation 9"coloum /beam with 10 mm compacted will be provided.

Road Work

AS PER THE GOVERNMENT NORMS WE WILL PROVIDE BITUMINOUS/FLEXIBLE PAVEMENT INTERNAL ROAD,WITH GOOD QUALITY MATERIAL USING WBM CONCRETE ROAD ARE HAVING PROPER DRAIN SYSTEM.

Footpaths

FOOTPATHS WILL BE PROVIDED AND AMPLE SPACE FOR ROADS IS BEING LEFT .

Water Supply Including Drinking Water Facilities

It will be done by allotees by themselves at their own cost.

Sewer System

THE DISPOSAL OF SEWAGE IS THROUGH UNDERGROUND DRAINAGE NETWORK USING RCC PIPES LINKED TO RWH/SEASONAL PONDS.

Drain

THE DRAINAG SYSTEM WILL BE UNDERGROUND DRAINAGE NETWORK USING RCC PIPES LINKED TO RWH/SEASONAL PONDS.

Parks

we are Providing 4 parks 2-are with desiner boundry wall grills furnished with paints,sitting chairs,walking paths etc., and 1-It will be developed for workout and for open gym with equipped gym equipment,1- will be developed with for kids equipped with Jhoolas,and other equipment.

Tree Planting

SHADY TREES WILL BE PLANT AND THE SPACE FOR THE SAME HAS BEEN MARKED AND SPACES HAS BEEN LEFT.

Design For Electric Supply Including Street Lighting

ARRANGEMENTS FOR ELECTRICITY SUPPLY INCLUDING STREET LIGHTING SYSTEM HAS BEEN MADE IN THE SAID PROJECT USING BRANDED PRODUCT AND ALL THE ARRANGEMENT IN THE SITE IS AS PER APPROVED MAP BY AUTHORITY AND AS PER UPPCL .

Community Buildings

NO COMMUNITY BUILDINGS ARE PLANNED IN THE PROJECT YET.

Treatment and Disposal System of Sewage and Sullage water

Underground Drainage Network (RCC600MM,300MM,200 pipe WITH CHANBER) linked to RWH / seasonal ponds.

Solid Waste Management And Disposal System

Construction of individual building on plot (by the respective allottee as per their individual ZILA PANCHAYAT Authority Sanction Plan)

Water Conservation System

NOT APPLICABLE

Energy Management System Including Use of Renewable Energy

SOLAR PANEL IN THE PUBLIC STREET LIGHT AND PARKS HAS BEEN PROVIDED

Fire Protection And Fire Safety System

NOT APPLICABLE

Social Infrastructure And Other Public Amenities Including Public Health Services

NOT APPLICABLE

Emergency Evacuation Services

NOT APPLICABLE

Other Miscellaneous Work

NOT APPLICABLE

New Documents

Registry Document

No: 8793 | Date: 17-05-2019

Registry Document

No: 8790 | Date: 17-05-2019

Extract of Khatauni

No: LETTER OF CLARIFICATION | Date: -

Uploaded Documents

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Waste Disposal Plan

Water Supply Plan

Water Supply Plan

Electricity Supply Plan

Electricity Supply Plan

Development Work Plan

Development Work Plan

CA CERTIFICATE

ARCHITECT CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 01-07-2020

Commencement Certificate

Uploaded: 01-07-2020

Other Plan(If Any)

Uploaded: 15-08-2020

Proforma of Application Form

Uploaded: 15-08-2020

Proforma of Allotment Letter

Uploaded: 15-08-2020

Proforma of Conveyance Deed

Uploaded: 01-07-2020

Waste Disposal Plan

Uploaded: 15-08-2020

Water Supply Plan

Uploaded: 15-08-2020

Electricity Supply Plan

Uploaded: 15-08-2020

Development Work Plan

Uploaded: 15-08-2020

Affidavit

Uploaded: 31-07-2020

ARCHITECT CERTIFICATE

Uploaded: 31-07-2020

Permits

Orignal Permit No1910
Orignal Permit Date19-02-2020
Valid Upto18-02-2022
Permit Extendable Upto18-02-2025
End Date18-02-2022

Project Team

Contractor Name (if any)QUMAR IDRISI
Contractor AddressMAIN ROAD,BARABANKI
Architect NameS.R. BUILDING DESIGNER
Architect AddressNear Hospital Tiraha Begumganj, Main Road , Barabanki
Architect Licence NumberL.C. NO.37/ll
Structural Engineer NameIMRAN SHOYEB KHAN
Structural Engineer AddressBARABANKI
Mobile number(Project Co-ordinator)9936660444

Project Land Details

Plot

Showing 1 blocks with 2 units

Property Summary

Total Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

2 units

Khasra Details

Total Area

5060.00

54465.33 ft²

2 plots
Khasra
Type:Khasra
Khasra/Plot No:2675
Area(In Sq. Mt.):5060
Khasra
Type:Khasra
Khasra/Plot No:0001
Area(In Sq. Mt.):000

Other Details

Contractor Name (if any):QUMAR IDRISI
Contractor Address:MAIN ROAD,BARABANKI
Architect Name:S.R. BUILDING DESIGNER
Architect Address:Near Hospital Tiraha Begumganj, Main Road , Barabanki
Architect Licence Number:L.C. NO.37/ll
Structural Engineer Name:IMRAN SHOYEB KHAN
Structural Engineer Address:BARABANKI
Mobile number(Project Co-ordinator):9936660444