26.963840
26.963840
It will be demarcated through a temporary wall.
5 FT.Height boundry wall with 3 deep eccentric foundation 9"coloum /beam with 10 mm compacted will be provided.
AS PER THE GOVERNMENT NORMS WE WILL PROVIDE BITUMINOUS/FLEXIBLE PAVEMENT INTERNAL ROAD,WITH GOOD QUALITY MATERIAL USING WBM CONCRETE ROAD ARE HAVING PROPER DRAIN SYSTEM.
FOOTPATHS WILL BE PROVIDED AND AMPLE SPACE FOR ROADS IS BEING LEFT .
It will be done by allotees by themselves at their own cost.
THE DISPOSAL OF SEWAGE IS THROUGH UNDERGROUND DRAINAGE NETWORK USING RCC PIPES LINKED TO RWH/SEASONAL PONDS.
THE DRAINAG SYSTEM WILL BE UNDERGROUND DRAINAGE NETWORK USING RCC PIPES LINKED TO RWH/SEASONAL PONDS.
we are Providing 4 parks 2-are with desiner boundry wall grills furnished with paints,sitting chairs,walking paths etc., and 1-It will be developed for workout and for open gym with equipped gym equipment,1- will be developed with for kids equipped with Jhoolas,and other equipment.
SHADY TREES WILL BE PLANT AND THE SPACE FOR THE SAME HAS BEEN MARKED AND SPACES HAS BEEN LEFT.
ARRANGEMENTS FOR ELECTRICITY SUPPLY INCLUDING STREET LIGHTING SYSTEM HAS BEEN MADE IN THE SAID PROJECT USING BRANDED PRODUCT AND ALL THE ARRANGEMENT IN THE SITE IS AS PER APPROVED MAP BY AUTHORITY AND AS PER UPPCL .
NO COMMUNITY BUILDINGS ARE PLANNED IN THE PROJECT YET.
Underground Drainage Network (RCC600MM,300MM,200 pipe WITH CHANBER) linked to RWH / seasonal ponds.
Construction of individual building on plot (by the respective allottee as per their individual ZILA PANCHAYAT Authority Sanction Plan)
NOT APPLICABLE
SOLAR PANEL IN THE PUBLIC STREET LIGHT AND PARKS HAS BEEN PROVIDED
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
Showing 1 blocks with 2 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5060.00 m²
54465.33 ft²