28,39,07
77,21,04
REAR - 160.930 M, SIDE - 108.551 M, FRONT- 265.644 M, RHS - 86.180 M , REAR - 27.319 M, SIDE - 9.270M, REAR - 35.651 M, SIDE - 70.979 M
RCC COLUMN AND BEAM STRUCTURE WITH BRICK WORK & MS RAILING
CEMENT CONCRETE TRIMIX WITH CEMENT CONCRETE PAVERS
CEMENT CONCRETE PAVERS
Domestic underground &overhead water tanks are provided which are to filled by the supply line provided by relevant concerning department
Well – Laid interconnected sewer lines are available which are further connected to the municipal sewer
Rain water harvesting system is provided in the entire campus. Units are designed considering the peak surface water.
Internal landscape courts and green are provided as per requirement.
Tree Plantation is provided as per Landscape Layout along with various type of trees, shrubs and hedges
Electrical Supply – System is provided according to requirement based on the design calculations
Club Building is provided
Internal sewer lines are connected to the external municipal sewer lines
Garbage chutes are provided in all towers separately and further thrown to the nearby garbage dumping yard
Rain Water Harvesting Systems is provided
Provision of V.F.D. (Variable Frequency Drive) in pump room for pumping the domestic and flushing water to minimize the energy requirement
Provision of all Fire fighting system and protection as per NBC and fire department which includes Sprinkles system, Wet Riser system, External Hydrant system water curtain system in basement and portable fire extinguisher , PA system
NA
Fire tender road and fire escape staircase are provided
NA
Showing 3 blocks with 44 units
Total Area
11934.62 m²
128463.06 ft²
Total Units
77
4 different types
Blocks & Floors
3
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
28922.54 m²
311319.33 ft²