DEMARCATION OF ALL 23 RESIDENCIAL PLOTS WITH THREE COMMERCIAL PLOTS AND ROAD AND PARK DEMARCATION WILL BE DONE BY US AFTER THE APPROVAL FROM RERA.
BOUNDARY WALL UPTO 2 MT. HEIGHT WILL BE CONSTRUCTED WITH BOTH SIDE PLASTER AND WHITE WASHING.
AFTER THE DEMARCATION THE EARTH FILLING WILL BE DONE FROM NATURAL GROUND LAVEL TO UPTO .60 MT FOR ROADS AND THEN C.C. ROAD WILL BE LAYED STEP BY STEP.
FOOT PATHS OF .60 MT WIDE ON BOTH SIDE OF ROADS WILL BE DONE WITH CEMENT INTERLOCKING TILES AND ALSO IN THE PARK ALL THE SIDES A PATHWAY WILLBE CONSTRUCTED.
AS PER DECLARED TO THE LOCAL AUTHORITY , THE INDIVIDUAL SUBMERSIBLES WILL BE PREPARED AND IMPLEMENTED TO EACH UNIT INDIVIDUALLY. SO THERE IS NO NEED OF WATER SUPPLY. PLEASE REFER TO SANCTIONED MAP FOR THE NOTE WRITTEN RELATED TO THIS.
SEWER LINE WILL BE LAYED UNDER THE ROAD AND WILL BE CONNECTED TO THE SEWER LINE FOLLOWING THE MAIN ROAD.
DRAIN LINE WILL ALSO BE PREPARED ON BOTH THE SIDES OF ROAD AND WILL BE CONNECTED TO THE MAIN DRAIN LINE FOLLOWING THE ROAD AFTER BEING CLEANED BY STP
BOTH THE PARKS WILL BE BOUNDED BY M.S. GRILL AND TREES WILL BE PLANTED , ALSO THE PATHWAY WILL BE PROVIDED FOR WALKING WITH LIGHTING LAMP AND GRASS WILL ALSO BE PLANTED IN THE COMPLETE PARK
TOTAL NO OF 46 TREES WILL BE PLANTED INCLUDING BOTH THE PARKS AND ALSO IN FRONT OF THE HOUSES UNDER THE FOOTPATH AREA.
WE WILL PROVIDE THE ELECTRICITY LINE WITH STREET LAMPS ALL OVER
N/A
N/A
N/A
RAIN WATER HARVESTING IS BEING PROVIDED AS PER THE SANCTIONED LAYOUT
N/A
N/A
N/A
N/A
N/A
Total Area
6427.90 m²