26.421980022492757
80.40780853105193
Grubbing/Clearing and Filing, Identification of Plots of demarcation of benchmarks with level of 450 mm down from the Road Level. Plot Corner will demarcate with four numbers of brick work pillars.
Not Required
RCC roads
Interlocked Pavers and club stones
MDPE domestic water supply pipelines to plots from OHT or UGR. OHT / UGR will feed from municipal water supply.
RCC hume pipes distribution network to STP (outside project domain in Township)
Saucer drains/catch basins Hume pipes to RWH structures. Overflow to Municipal drain.
As per Bye laws/Sanctioned plan from KDA
As per Bye laws/Sanctioned plan from KDA
Service connections to plots from captive Substations. Street and Park Lighting 6.5 / 9 meters electric poles as per Lay out.
As per Bye laws/Sanctioned plan from KDA
Treated water used for horticulture and road washing.Connectivity to STP in Township (Beyond project boundaries)
Door to door Collection from plots to common segregation and disposal unit near vendor’s Zone. Final disposal by Municipal system.
RWH structures to harvest rain water suitably located in parks/open spaces
Not Applicable
Not Applicable
Common facilities like Community Hall, Schools and Playgrounds obtain within the Emerald Gulistan Township of which Phase is a part.
Not Applicable
CCTV / Telephone / Security in Township (Beyond project boundaries). Theme Wall on two sides of the project to enclose the project.
Showing 1 blocks with 3 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
38684.43 m²
416395.34 ft²
Processing Time
1067 days
From application to approval
27-10-2021
28-09-2024