NewActive

EMERALD GULISTAN PHASE-IV

Kanpur Nagar, Uttar Pradesh
29-03-2022Completion
NewType
Kanpur NagarDistrict
1502 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):38684
Project Name:EMERALD GULISTAN PHASE-IV
Registration Fee (in Rs.):198500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):27
District:Kanpur Nagar
Original Start Date:-
Tehsil:Kanpur
Proposed Start Date:01-01-2020
Sanctioning Competent Authority:Kanpur Development Authority
Project Cost (in Lacs):1502
Proposed Completion Date:29-03-2022

Location

Latitude

26.421980022492757

Longitude

80.40780853105193

Bank Details

Account no.:0090102000042291
Name Of Account Holder:J.K. COTTON LIMITED-EMERALD GULISTAN PHASE-IV
Bank Name:IDBI BANK
Branch Address:M. G. ROAD NEAR STATUE JUNCTION KANPUR UTTAR PRADESH
Branch Name:M. G. ROAD KANPUR UTTAR PRADESH
IFSC Code:IBKL0000090

Development Works

Demarcation of Plots

Grubbing/Clearing and Filing, Identification of Plots of demarcation of benchmarks with level of 450 mm down from the Road Level. Plot Corner will demarcate with four numbers of brick work pillars.

Boundary Wall

Not Required

Road Work

RCC roads

Footpaths

Interlocked Pavers and club stones

Water Supply Including Drinking Water Facilities

MDPE domestic water supply pipelines to plots from OHT or UGR. OHT / UGR will feed from municipal water supply.

Sewer System

RCC hume pipes distribution network to STP (outside project domain in Township)

Drain

Saucer drains/catch basins Hume pipes to RWH structures. Overflow to Municipal drain.

Parks

As per Bye laws/Sanctioned plan from KDA

Tree Planting

As per Bye laws/Sanctioned plan from KDA

Design For Electric Supply Including Street Lighting

Service connections to plots from captive Substations. Street and Park Lighting 6.5 / 9 meters electric poles as per Lay out.

Community Buildings

As per Bye laws/Sanctioned plan from KDA

Treatment and Disposal System of Sewage and Sullage water

Treated water used for horticulture and road washing.Connectivity to STP in Township (Beyond project boundaries)

Solid Waste Management And Disposal System

Door to door Collection from plots to common segregation and disposal unit near vendor’s Zone. Final disposal by Municipal system.

Water Conservation System

RWH structures to harvest rain water suitably located in parks/open spaces

Energy Management System Including Use of Renewable Energy

Not Applicable

Fire Protection And Fire Safety System

Not Applicable

Social Infrastructure And Other Public Amenities Including Public Health Services

Common facilities like Community Hall, Schools and Playgrounds obtain within the Emerald Gulistan Township of which Phase is a part.

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

CCTV / Telephone / Security in Township (Beyond project boundaries). Theme Wall on two sides of the project to enclose the project.

New Documents

Registry Document

No: 528 | Date: 14-02-2011

Uploaded Documents

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 13-01-2020

Commencement Certificate

Uploaded: 13-01-2020

Proforma of Application Form

Uploaded: 01-01-2020

Proforma of Allotment Letter

Uploaded: 01-01-2020

Proforma of Conveyance Deed

Uploaded: 01-01-2020

Waste Disposal Plan

Uploaded: 21-01-2020

Water Supply Plan

Uploaded: 13-01-2020

Electricity Supply Plan

Uploaded: 13-01-2020

Development Work Plan

Uploaded: 13-01-2020

Affidavit

Uploaded: 01-01-2020

ENGINEERS CERTIFICATE

Uploaded: 13-01-2020

Permits

Orignal Permit No1055/BHAWAN/ONLINE/2018-19
Orignal Permit Date29-06-2019
Valid Upto28-06-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto27-06-2025
End Date30-09-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All Types-
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)RITU INFRACON BUILDS LIMITED
Contractor Address117/K/13, GUTAIYA, KANPUR
Architect NameSAMIR KUMAR CHAKRAVORTY
Architect Address117/K/13, SARVODAYA NAGAR, KANPUR
Architect Licence NumberCA-81-08366
Structural Engineer NameN.A.
Structural Engineer AddressN.A.
Mobile number(Project Co-ordinator)8009551300

Project Land Details

Plot

Showing 1 blocks with 3 units

Property Summary

Total Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

3 units

Khasra Details

Total Area

38684.43

416395.34 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:PART OF PLOT NO. 2, SCHEME NO. 39, JAJMAU, KANPUR
Area(In Sq. Mt.):38684.43

Account Closure Details

Processing Time

1067 days

From application to approval

Application Submitted

27-10-2021

Application Approved

28-09-2024

Other Details

Contractor Name (if any):RITU INFRACON BUILDS LIMITED
Contractor Address:117/K/13, GUTAIYA, KANPUR
Architect Name:SAMIR KUMAR CHAKRAVORTY
Architect Address:117/K/13, SARVODAYA NAGAR, KANPUR
Architect Licence Number:CA-81-08366
Structural Engineer Name:N.A.
Structural Engineer Address:N.A.
Mobile number(Project Co-ordinator):8009551300
EMERALD GULISTAN PHASE-IV by J. K. COTTON LIMITED | ReraTracker