28* 42‘22.92” N
77* 25‘ 44.76” E
Designated plot is demarcated as per the sanctioned plan issued by the authority.
1800-2100 mm high along entire periphery.
Cement concrete internal roads (CC roads above the 2 corse of WBM)
Footpaths in interlocking pavers
Water to be provided by GDA andthe developer will make UGT of capacity as per norms.
Main sewer has been designed as per norms and partially lay in basement ceiling and finally connect to STP
Underground systems using uPVC (SN-4) and masonary chambers sewer pipes.
Landscaping and tree plantation shall be done as per authority guidelines
Landscaping and tree plantation shall be done as per authority guidelines
Design has been done as per UP electricity board guidelines and shall be provided necessary switch gears etc. for distributing electricity as low voltage.
Club shall be designed as per authority guidelines
STP of capacity as per norms shall be provided. Treated water shall be used for Flushing, irrigation, car wash, pathway cleaning etc. ans surplus water shall be discharged into drains with due approval from competent authority.
Manual collection and Organic Waste converter shall be provided in the project.
Recycling of treated water and rain water systems to be provided.
Multi point metering for individual apartment owners shall be there for energy purchased from the grid/ power supply company.
Fire tender path shall be provided as per NBC. Fire fighting system along with pumps and water storage tanks shall be provided as per norms and fire NOC shall be taken from competent authority.
shall be provided as per bye laws of GDA.
Mock Drills shall be conducted as per NBC
NA
Showing 26 blocks with 116 units
Total Area
22912.53 m²
246628.18 ft²
Total Units
217
4 different types
Blocks & Floors
26
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15416.84 m²
165945.32 ft²
Processing Time
133 days
From application to approval
13-01-2023