28.70
77.43
Private Free hold Land, Demarcation was already done before starting the project
Boundary wall on RCC Tie, Beam on RCC Footing
Cements Concrete internal Roads(CC Roads above to Layers of WBM
Interlocking Tile on PCC on completed surface
To be provided By Ghaziabad Development Authority and stores will be done underground water
Main sewer line has been design as per norm and partially led in Basement ceilling and will fin.
Under Ground Drain pipe with chamber
Landscape and park has been designed as per Authority Guide lines
Tree panting has been design as per Authority Guide lines
Design has been done as per UP electicity Board Guide lines.
Club has been Design as per Authority Norms and facility like party hall gaming Zone Entertainment area Gym etc.
Sewage will be threated for recycling (if required ) other wise it will be connected two sewage line of Authority which is already connected to central functional STP of GDA For this locality.
Door to Door Collection and will be treated by waste disposal management.
Recycling of Treated water and rain water harvesting system to be provided.
Solar panel will be provided as per norms as suitable Places
Fire System is being executed per the norm of department of fire.
Nursary School in the premises
Provision of exit sign and emergency light.
N/A
Showing 1 blocks with 70 units
Total Area
3435.76 m²
36982.18 ft²
Total Units
70
1 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1413.00 m²
15209.39 ft²