28.3912
77.2835
Yes, It has already been done and boundary wall for the township is also ready.
Yes, RCC Columns and Masonary with Railings.
Internal Roads will be of concrete and grass pavers with kerb stone on sides.
Yes, It will be made with RCC concrete with trimix finish.
Yes, Water supply from SMV Agency will provide as we are a part of integrated township.
Sewer system in Building will be with PVC pipe and underground sewer system will be with RCC pipe and same will be connected to township level STP.
Yes, Saucer Drains and RCC Hume Pipe sewerage system.
Yes, Beautiful landscape will be done as per our drawings.
Yes, it will be done as per drawings.
Yes, the elecrtric supply along with power back up will be provided with 50 percent diversity factor.
Yes, GYM, CLUB, Swimming Pool Indoor Games Facility will be provided.
S.T.P and through Authority Sewrage System.
Yes, Organic Waste Convertor, Collection Bins.
Yes, Rain water harvesting Pits.
Yes, Solar panels will be installed on terrace of towers so as to manage the electicity.
Yes, all places will be covered with proper fire fighting system fire alarm system.
Proper water supply and sanitary facilities on ground floor.
Yes, all stairs reach at ground floor level for easy and fast evacution.
NA
Showing 2 blocks with 158 units
Total Area
20939.07 m²
225386.06 ft²
Total Units
290
3 different types
Blocks & Floors
2
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17710.00 m²
190628.67 ft²