Launch Date
Completion Date
RERA ID
28.6480
77.4032
Part of Plot No. 4/BS-01 and BS-05 Siddharth Vihar, NH-24, Ghaziabad
Combination of RCC and MS Work upto 2.4 meter maximum height with pheripheral tree plantation along boundary
Cement Concrete Road with design patterns catering to fire tender route
Footpaths are made up of cement concrete to connect the entire project with entrance lobbies
Water supply connection will be provided by UPAVP (Uttar Pradesh Awas Evam Vikas Parishad), Ghaziabad and will be connected upto project extent and will further distribute to flats.
Sewar water will be treated in the proposed project Sewage Treatment Plant of capacity 550 KLD
Storm Water drainage will be connected to Rain Water Harvesting System provided as per norms
Park/Green areas will be developed as per Sanctioned Plan
Different evergreen and ornamental trees and Shrubs, groundcovers, creepers will be provided
Electricity supply will be provided by UPPVVNL
A Multipurpose room will be provided.
Sewage and sullage water will be treated in proposed Sewage Treatment plant of capacity 550 KLD
Solid Waste management area will be provided as per norms
All water from Hardscapes, Terraces, Internal roads will be connected with Rain Water Harvesting pit to recharge groundwater
Solar energy system/ photovoltaic will be provided at terrace level to cater the energy needs of common areas
Fire fighting system will be provided as per fire norms
Play area and Elderly Sitting Corners
Building premises are equipped with fire staircases, fire shafts and are provided with hose reels and other necessary equipments, fire tender route is provided as per fire norms.
N/A
Showing 4 blocks with 130 units
Total Carpet Area
33858.00 m²
364444.13 ft²
Total Units
1368
1 different types
Blocks & Floors
4
18 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
154916.51 m²
1667505.80 ft²