NewActive

PMAY Phase-I, Village-Miranpur Pinvat, Sarojni Nagar, Lucknow.

Lucknow, Uttar Pradesh
01-04-2019
RERA Received Date
New
Type
29-09-2022
Completion Date

Overview

RERA Received Date

01-04-2019

Completion Date

29-09-2022

RERA ID

UPRERAPRJ109612

Location

Latitude

26.71689

Longitude

80.846969

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)2440
Project NamePMAY Phase-I, Village-Miranpur Pinvat, Sarojni Nagar, Lucknow.
Registration Fee (in Rs.)17500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)42
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date01-04-2019
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)1603
Proposed Completion Date29-09-2022

Bank Details

Account no.50100135403889
Name Of Account HolderExecutive Engineer Construction Division-Twelve UPAVP LUCKNOW
Bank NameHDFC BANK LTD.
Branch AddressRAEBARELI ROAD, LUCKNOW UTTAR PRADESH-226025
Branch NameSARDAL PATEL DENTAL COLLEGE RAEBARELI ROAD LUCKNOW.
IFSC CodeHDFC0004768

Development Works

Demarcation of Plots

Flat Constructed on Khasra No 339, Village-Miranpur Pinvat, Sarojni Nagar, Lucknow.

Boundary Wall

Not Proposed at present

Road Work

Internal Road will constructed by UPAVP and trunk road will constructed by UPPWD as per GO.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Footpaths

Not Proposed at present

Water Supply Including Drinking Water Facilities

Internal Drinking water facility will be Provide by UPAVP and External Water facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Sewer System

Internal Sewer facility will be Provide by UPAVP and External Sewer facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Drain

Internal Drain facility will be Provide by UPAVP and External Drain facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Parks

Will be Constructed by UPAVP, Lucknow.

Tree Planting

Will be done by UPAVP, Lucknow.

Design For Electric Supply Including Street Lighting

Internal Electric Supply and Street Lighting will be Provide by UPAVP and External Electric Supply and Street Lighting will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Community Buildings

community building like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Treatment and Disposal System of Sewage and Sullage water

Will be done by UP Jal Nigarm, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Solid Waste Management And Disposal System

Will be done by UP Jal Nigarm, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Water Conservation System

Not Applicable

Energy Management System Including Use of Renewable Energy

Will be done by UP Power Corporation, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Fire Protection And Fire Safety System

Not Required

Social Infrastructure And Other Public Amenities Including Public Health Services

Social Infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

Not Applicable

Documents

Extract of Khatauni

No: 1425-1430 | Date: -

Allotment Letter issued by Competent Authority

No: 718/PMAY-PRAKOSTHA 2019 | Date: 20-02-2019

Details of Encumbrances

Uploaded: 27-02-2019

Commencement Certificate

Uploaded: 27-02-2019

Other Plan(If Any)

Uploaded: 08-01-2019

Proforma of Application Form

Uploaded: 27-02-2019

Proforma of Allotment Letter

Uploaded: 27-02-2019

Proforma of Conveyance Deed

Uploaded: 27-02-2019

Proforma of Completion Certificate(Occupancy)

Uploaded: 27-02-2019

Waste Disposal Plan

Uploaded: 27-02-2019

Water Supply Plan

Uploaded: 27-02-2019

Electricity Supply Plan

Uploaded: 27-02-2019

Development Work Plan

Uploaded: 27-02-2019

Affidavit

Uploaded: 27-02-2019

CA CERTIFICATE

Uploaded: 16-02-2019

ARCHITECT CERTIFICATE

Uploaded: 16-02-2019

ENGINEERS CERTIFICATE

Uploaded: 16-02-2019

Permits

Orignal Permit No5654
Orignal Permit Date20-12-2018
Valid Upto30-03-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-03-2022
End Date30-03-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NameMr. Sanjeev Kashyap
Architect AddressARCHITECHURE PLANNING UNIT-04, U.P. AVAS EVAM VIKAS PARISHAD, LUCKNOW.
Architect Licence NumberGovernment Institution
Structural Engineer NameIRSHAD AHMAD
Structural Engineer AddressARCHITECT AVENUE,D-2/122,Sambhav Tower,Vibhuti Khand,Gomti Nagar,Lucknow
Mobile number(Project Co-ordinator)8795810157

Land Details

AFS

Showing 1 blocks with 4 units

Property Summary

Total Carpet Area

5464.80

58822.56 ft²

Total Units

240

1 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:22.77
Balconies:3
Parking ratio:0.00 per unit

Block 1 TO 5

4 units

Khasra Details

Total Area

22500.00

242187.75 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No339 Of Village-Miranpur Pinvat, Sarojni Nagar, Luc
Area(In Sq. Mt.)22500

Other Details

Contractor Name (if any)NA
Contractor AddressNA
Architect NameMr. Sanjeev Kashyap
Architect AddressARCHITECHURE PLANNING UNIT-04, U.P. AVAS EVAM VIKAS PARISHAD, LUCKNOW.
Architect Licence NumberGovernment Institution
Structural Engineer NameIRSHAD AHMAD
Structural Engineer AddressARCHITECT AVENUE,D-2/122,Sambhav Tower,Vibhuti Khand,Gomti Nagar,Lucknow
Mobile number(Project Co-ordinator)8795810157
PMAY Phase-I, Village-Miranpur Pinvat, Sarojni Nagar, Lucknow. by U.P. AWAS EVAM VIKAS PARISHAD | ReraTracker