Total Units
96
1 unit type
Carpet Area
23,529 ft²
2,185.92 m² · carpet only, excludes balcony
Blocks & Floors
2
8 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 245 ft² (22.77 m²)Balconies 8Parking per unit 0.00
All blocks
Showing 8 of 8 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| 1 | GF | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 1 | 1 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 1 | 2 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 1 | 3 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 2 | GF | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 2 | 1 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 2 | 2 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
| 2 | 3 | 1 BHK | 12 | 245 ft²22.77 m² | 1 | 18 ft²1.66 m² |
Total Plot Area
3.71 acres
15,000.00 m² · plot area
Flat Constructed on Khasra No.- 50 Mi, Vill- Devanandpur, Tehsil- Sadar, Distt. Raebareli
Not proposed at present
Internal Road will constructed by UPAVP as per sanction layout and trunk approach road will constructed by UPPWD as per G.O no 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Not proposed at present
Internal Drinking water facility will be provided by UPAVP and External water facility will be provided by Jal Nigam as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Internal sewer facility will be provided by UPAVP and External Sewer water facility will be provided by Jal Nigam as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Internal Drain facility will be provided by UPAVP and External drain facility will be provided by Local Bodies as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
will be constructed by UPAVP, Lucknow
Will be done by UPAVP, Lucknow
Internal Electricity facility will be provided by UPAVP and external electricity Will be Provided by Electricity Department as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Community building like health center, school, anganbaries etc will be done by concerning department as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
will be done by UP Jal Nigam as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
will be done by UP Jal Nigam as per G.O. No. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Not applicable
will be done by UP Power corporation as per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
As per PMAY Norms./specification
Social Infrastructure And Other Public Amenities Including Public Health Services will be done by concerning department As per G.O. no. 1878/Eight-1-18-80/Misc/2010 Awas Evam Shahri Niyojan anubhag-1 Dt. 17.10.2018
Not applicable
Not applicable
PMAY, Construction of 96 nos Flats G+3 Type at Vill-Devanandpur, Raebareli. is located in Raebareli.
Yes. PMAY, Construction of 96 nos Flats G+3 Type at Vill-Devanandpur, Raebareli. is registered under UPRERAPRJ340768 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for PMAY, Construction of 96 nos Flats G+3 Type at Vill-Devanandpur, Raebareli. is 1 January 2025.
PMAY, Construction of 96 nos Flats G+3 Type at Vill-Devanandpur, Raebareli. is developed by U.P. AWAS EVAM VIKAS PARISHAD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.