Have queries on this Project?
27.595213
81.639314
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
54145.00 m²
582811.37 ft²
As per approved layout plan.The plots shall be demarcated by means of T.
Parishad shall not provide any boundary wall. To be built by the allotte concern inline with the Bhawan Nirman Upvidhi.
As per specification of UP Awas Evam Vikas Parishad (Chief Engineers Order No. 685/M-4/2017 Dt 19.03.2017 and others) and work shall be carried out as per U.P.P.W.D. specifications. Soling coat with 45-90 mm stone ballast. Inner coat with 45-63 mm stone ballast. Top coat with 22.4-53 mm stone ballast. Bituminous coat over top coat.
As per specification of UP Awas Evam Vikas Parishad (Chief Engineers Order No. 685/M-4/2017 Dt 19.03.2017 and others) and work shall be carried out as per U.P.P.W.D. specifications.
Shall be provided as per norms and specifications of UP Jal Nigam. The network consist of Trunk water line laid in trunk road cross section with OHT in sector to cater to the plots.Water line laying of PVC pipe ISI Mark (Pressure 6.00 Kg per sqcm) at site.
The under ground sewer network with manholes and chambers shall be provided in accordance with UP Jal Nigam specifications and Chief Engineers order no 912/M-1/94 dt 20.10.2005. Sewer line provided through Class NP2 and NP3 type RCC hume pipe of different dia as per design.
Open channelised water drainage network is to be provided. Drains shall be of Type C1,C2,C3 etc. The construction shall be as per UPPWD specifications. Brick work drains are provided in ratio of 1;6 of cement and approved coarse sand . Culvert are provided in the junctions of road as per design.
Provided as shown in approved layout.The construction and development shall be inline with Office Order No. 878/ISO dt 05-04-2017. Brick work and railing provided at boundary of park.
Provided as shown in approved layout. The construction and development shall be inline with office order no 878/ISO dt 05-04-2017.
Shall be done by UPAVP and handed over to UPPCL.
Community buildings shall be built in future as per approved layout.
Planned sewer network for intire Yojna . These plots shall be connected to this proposed network.
kuda ghar provided by UPAVP as per Layout.
Not provided.
Not provided.
Not provided.
As per approved Plan but built in future.
Not provided.
Not provided.