THE PLOTS WILL BE DEMARCATED BY CONCRETE PILLERS TO ALL 4 SIDES OF THE PLOT BOUNDARY , TO THE EXACT SHAPE , SIZE AND ORIENTATION AS PER SANCTIONED MAP BY LUCKNOW DEVELOPMENT AUTHORITY.
A 2.4 METER HIGH PRE-FABRICATED BOUNDARY WALL WILL BE CONSTRUCTED WITH DEEP FOUNDATION ALONG WITH BARBED WIRE FENCING AT THE TOP.
CONCRETE ROADS WITH 150-200MM GSB, 100-150MM WMM, 75-100MM PCC AND 100-125 MM TRIMIX WHEREEVER APPLICABLE AS PER APPROVED LAYOUT.
AN M-15-M30 GRADE OF PAVER BLOCK/INTERLOCKING TILES WILL BE LAID IN THE PROJECTFOR WALKING AREAS. TILES WILL BE 60MM, THICK AND THE COLOUR PATTERNS WILL BE LASTING.
A POTABLE GROUND WATER SUPPLY THROUGH PUMPING ARRANGEMENTS WILL BE DELIVERED TO THE OVER HEAD TANK OF 450,000 LITRES CAPACITY. THE WATER FROM THERE WILL BE DEVILERED THROUGH UNDERGROUND DOMESTIC WATER SUPPLY LINE (UPVC) OF 110MM.
SEWAGE WILL BE COLLECTED THROUGH A RCC-NC3 PIPE (300-350MM) ARRANGEMENT, U BENDS AND INSPECTION CHAMBERSLEADING TO SEWERAGE TREATMENTS PLANT (STP).
A SURFACE DRAIN WATER WILL BE COLLECTED THROUGH RCC NC3 PIPE OF 450-600 MM AND WILL BE RELEASED TO STORM WATER LINE FOR DISCHARGE.
THE GREEN AREAS WILL BE LANDSCAPED WITH HARD AND SOFT LANDSCAPING AS PER DESIGN. THE PARKS WILL HAVE FOOTHPATHS, SITTING, AREAS AND PLAY AREA FOR CHILDRENS.
THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIOBS OF THE PROJECT AND ALONG THE BOUNDARY WALL.
ELECTRICAL LAYOUT AND CAPACITY WILL BE INSTALLED TO FUFFICE THE DOMESTICS USE. ALL ELECTRICAL CABLING WILL BE UNDERGROUND AND STREET LIGHTS WILL BE AS PER WORKING DRAWINGS.
NA.
ALL WASTE OF SEWER LINE TO BE COLLECTED AT STP, AFTER TREATMENT, TREATED WATER TO BE USED FOR WATERING OF THE GREEN AREAS. RWH LINE IS PLANNED TO COLLECT WATER FROM DRAIN AND TO BE DIRECTED TO MULTIPLE RECHARGE PITS. IRRIGATION OF PLANT BY FLUSH-WATER SYSTEM, AS PER SANCTION LAYOUT.
ALL WASTE OF SEWER LINE TO BE COLLECTED AT STP, GARBAGE COLLECTION TO BE DONE THROUGH AUTHORISED AGENCY AND TO BE DISPOSED AT GARBAGE DISPOSAL AREA AS PER SANCTION PLAN.
RAIN WATER HARVESTING LINE TO BE LAID , IRRIGATIONOF PLANT BY FLUSH-WATER SYSTEM, AS PER SANCTIONED LAYOUT RWH LINE IS PLANNED TO COLLECT WATER FROM DRAIN AND TO BE DIRECTED TO MULTIPLE RECHARGE PITS. IRRIGATION OF PLANTS BY FLUSH -WATER SYSTEM AS PER SANCTIONED LAYOUT.
NA
NA
NA
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
128264.00 m²
1380620.87 ft²