Launch Date
Completion Date
RERA ID
28.880248
78.756063
Demarcation will be done as per approved layout . Total no. of plots . are 21 .
Boundary wall is 3 m high, built in 230 mm thick brick work .
Internal roads are 12 m wide Road ,and 9 m wide Road .
Footpaths are 1.5 m wide .
Water supply will be provided by developer through pump Room .
S.T.P ( Sewer Treatment plant ) is proposed by developer . 150 mm - 300 mm diameter sewer pipes are laid on site..
Storm lines have been provided by developer along with Roads . ( 150 - 300 mm ) diameter pipes are laid .
Land has been reserved for park as per Layout .
Tree planting will be done as per along with roads as per layout.
Electrical substation are proposed by developer for electric supply .
N/A
STP system has been proposed by developer for Treatment and disposal system of sewage and sewage water .
Solid waste Management and Disposal system has been provided by developer as per requirement .
Rain water harvesting plants will be constructed on site for water conservation .
N/A
N/A
N/A
N/A
N/A
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
22498.00 m²
242166.22 ft²