Launch Date
Completion Date
RERA ID
28.879169
78.758871
Demarcation will be done as per approved layout . Total no. of plots 42 NOS
Boundary wall is 3m high built in 230mm thk. brick work
Internal roads are 18m , 12m wide
1.5m wide pedestrians
Water supply will be provided by developer through pump room.
S.T.P (Sewer Treatment Plant) is proposed by developer (150mm-300mm dia). Sewer pipe will laid on site.
Storm lines have been provided by developer along the Roads (150-300mm dia).
Land has been reserved for parks and Landscaping.
Tree planting will be done as per Layout.
Electrical substation are proposed by developers.
N/A
STP system has been proposed by developer for treatment and disposal system of sewage and sewage water.
Solid waste management and disposal system has been provided by developer as/req.
Rain water harvesting Tank will be constructed on site for water conservation.
N/A
N/A
N/A
N/A
Other Miscellaneous work will be done as per approved layout
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
39128.11 m²
421171.06 ft²