Plot is already demarcated all the development and construction work will be done under the demarcated plot.
Brick work boundary wall at theheight of 1800 mmand600 mmhigh MS grill. Combination of RCC is proposed around the project as per sanctioned plan
6.00 M Wide Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan
Afootpath with a PCC base, 60 mmthick paver blocks, and kerb stone edging shall be provided as per the proper standard practice in the city.
o Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and controlvalves are installed to convey water from the main pup station to various parts of thebuilding and site . The distribution network is designed to optimise flow rates, pressure levels, and water quality and builthroughout the system.
A centralised sewer system will beprovided, a300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm diaof the manhole provided as per design of MEP system.
Storm water system will be provided which will be connected to the Municipal drain line as per specified plan.
NA
Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
ACentralized transformer(1250 KVA Capacity), HT panel, LT panel, Feeder Pillar, and DG backup(250 KVA capacity) for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, Feeder pillar, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
There is a Club house buildingproposed in ourproject with all required amenities.
A separate sewerage network will be provided. An R.C.C. sewer line will be installed. Manholes of 900 mm diameter will be provided as per the MEP system design. The proposed network will discharge the sewage into the proposed STP. The capacity of STP is 250KLD
For Waste management and garbage collection Dust-bins are proposed in open areas. After completing the project, it will be operated by the local municipal corporation
A well-designed groundwater recharge arrangement as rainwater harvesting system shall be provided.
WewilluseLEDlightsaswellassolarlightsinexternalareas for energy management system
Fire normsshall be followed as perNBC andapproval ofthe fire department which shall include the following: o Smoke detectors, heat detectors, and manual pull stations throughout the building. o Fire ProtectionAndFireSafety System* Centralized monitoring with integration for emergency response. o A comprehensive wet riser & automatic sprinkler system with static underground water storage as per standards. o Hydraulically calculated pipework for adequate water supply and pressure requirements
NA
Thestaircasewill be provided with emergencyexit doorsin each floor as per fire department specifications.
Entrance lobby shall be provided & gardenat Podium level is provided
Showing 4 blocks with 83 units
Total Carpet Area
43331.20 m²
466412.70 ft²
Total Units
376
3 different types
Blocks & Floors
4
23 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
35780.00 m²
385132.34 ft²