Launch Date
Completion Date
RERA ID
28.45869868374659
79.43817698159997
Demarcated at site
Boundary wall is constructed and completed
Bitumen Road proposed
N. A.
Water Supply Through Over/under ground water storage
Underground sewer line and STP for treatment
Open drain on both side of road
15% GREEN AREAS (AS PER APPROVED LAYOUT)
Tree plantation in Parks is proposed
Multi-point connection for all
N. A.
Through S.T.P.
N.A.
Rain water Harvesting is proposed
N.A.
Fire Hydrants are proposed as per norms
N.A.
N.A.
N.A.
Total Area
9716.30 m²
104585.28 ft²