NewActive

Parekh Enclave

Lucknow, Uttar Pradesh
03-03-2022
RERA Received Date
New
Type
09-08-2025
Completion Date

Overview

RERA Received Date

03-03-2022

Completion Date

09-08-2025

RERA ID

UPRERAPRJ420064/05/2026

Location

Latitude

26.787603

Longitude

80.926248

Basic Details

Project TypeNew
Project CategoryMixed
Total area in round figure (Sq.mt.)16345
Project NameParekh Enclave
Registration Fee (in Rs.)130500
AddressPlot No. GH-1A, Ratan Khand,
Village/Locality/Sector etc.Saleh Nagar, Sharda Nagar Scheme, Bangla Bazar Road
StateUttar Pradesh
Project Duration (In month)42
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date03-03-2022
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)1400
Proposed Completion Date09-08-2025

Bank Details

Account Details
Name of the AccountNikhil Parekh Collection Account for Parekh Enclave A/C
Account Number061172500000198
Bank NameYes Bank Ltd.
Branch NameGomti Nagar
Branch AddressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh
IFSC CodeYESB0000611
Branch DistrictLucknow
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountNikhil Parekh Separate Bank acc for Parekh Enclave A/C
Account Number061172500000201
Bank NameYes Bank Ltd
Branch NameGomti Nagar
Branch AddressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeYESB0000611
Transaction Account Details
Name of the AccountNikhil Parekh Rera Trans Acc for Parekh Enclave A/c
Account Number061172400000082
Bank NameYes Bank Ltd
Branch NameGomti Nagar
Branch AddressGround Floor TC 56-BV, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeYESB0000611

Development Works

Demarcation of Plots

The project comprises total 54 plots from the range of 50 Sq Mt to 300 Sq Mt properly demarcated, through their border line by brick work. Total project has 1 no. entry and exit point from Bangla Bazar Road. Project is surrounded on east side by LDA Land, west 45 mtr road, South side Plot no GH1 and north side Abadi.

Boundary Wall

Boundary wall is 7.5 Mtr High and 3 side made with 5 inch wide brick work as plastered wall with 1 - 3 -6 cement concrete foundation at one side with Iron Rod and properly structured with thick compounds. Entrance have security Guard Room.

Road Work

All internal roads with interlocking with 125 MM GBS and 15 MM, M30 Grade PQC on pavement area including pathway with curb stone as suggested by Architect with approved map and connected with main road.

Footpaths

All footpath and internal road have narrow footpath with paver and pavement on pathway with curbstone and according to LDA map, These Road are developed and completed fully.

Water Supply Including Drinking Water Facilities

Project have own overhead Water storage tank having height of 25 mtrs. and water supply through boring of tubewell of 300 mtrs depth togather with pump house to ensure adequate 24 hours water supply with purity and quality. This project has plan to supply water at each plot and work fully completed.

Sewer System

Proect has underground sewer line at depth 0 to 1.5 MTRS. with 600 MM dia RCC NP-3 hume pipe. There is suffecient capacity of Centralised Sewerage system placed. All Sewerage water flowing from STP of 100 KLPD for treatment . Fully Completed.

Drain

Strom water system is provided, Strom water from roads and other land scape area is connected to strom water drain channel and go to the rain water harvesting pit / water colletcion pond for recharge of ground water and overflow is connected with municiple drain line. Drain as mark in sanctioned map Available at each plot and Completed as per Map.

Parks

2452.15 Sq Mt Park area provided with buitification along with green area, Play area for children and different recreation activities as mentioned in approved Map. Park duly demarcated with wall and safe for childrean and old age persons.

Tree Planting

The trees category of ornamental, shady, and native species is planted in the entire project open space as per availability of green land area. Tree Planting in park area and in open space fully grown. all well groomed tree are planted now have full grown.

Design For Electric Supply Including Street Lighting

POwer illumination and common lighting of all comman area including area allocated to the common services with high street pole and underground cable. For electric supply 11KV double pole structure installed with Light feeder pillar. All electric designs have earthing and lighting conductor. The project is equipped with a transformer of 500 KVA which is 25 excess of required load of project. Electric supply is sent through underground cables that is aluminium conducted PVC insulated armoured serve sheated cable 1100 volt grade at the depth of 750 mm below ground level over a cushion of 75 mm thick sand and available at each plot as per map and fully functioning.

Community Buildings

Community Building not available but while formation of RWA it will take care

Treatment and Disposal System of Sewage and Sullage water

STP of 100 KLD is installed and working as centralised system and fully functioning as per LDA Norms and working. It is connected with each plot and finally join to centralized system, recycle water is used for gardening, flush tank and washing.

Solid Waste Management And Disposal System

Project has waste segregation area along with 2 bin system of dustbin at marked area for collection of segerated. all waste from one point handed over to the government agency of waste collection.

Water Conservation System

Project has well designed rain and strom water mangement system with pit and pond at utility area. All rain water of each plot connected with centralised system.

Energy Management System Including Use of Renewable Energy

Project have wide open area available sunlight and fresh open air ventilation at each level of plot. For Common area light use LED and STP and pump room all equipement five star energy saver equipement. available.

Fire Protection And Fire Safety System

Open area is placed for fire protection and all cable are insulated and have fire proof with ISO norms and motor and other equipments are have fire safety norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

As per norms and proper provision

Emergency Evacuation Services

As per norms and in green area as spaced in project

Other Miscellaneous Work

NA

Documents

Sale Deed

No: 38537 | Date:

Sale Deed

No: 14410 | Date:

Sale Deed

No: 0030018 | Date:

Registry Document

No: 24264 | Date:

Registry Document

No: 2026228011324 | Date:

Registry Document

No: 33 | Date:

Registry Document

No: 34 | Date:

Registry Document

No: 32 | Date:

Registry Document

No: 31 | Date:

Registry Document

No: 167 | Date:

Details of Encumbrances

Uploaded: 27-03-2026

Commencement Certificate

Uploaded: 10-02-2026

Other Plan(If Any)

Uploaded: 27-03-2026

Proforma of Application Form

Uploaded: 18-02-2026

Proforma of Allotment Letter

Uploaded: 09-04-2026

Proforma of Conveyance Deed

Uploaded: 05-04-2026

Proforma of Completion Certificate(Occupancy)

Uploaded: 29-12-2025

Waste Disposal Plan

Uploaded: 27-03-2026

Water Supply Plan

Uploaded: 27-03-2026

Electricity Supply Plan

Uploaded: 27-03-2026

Development Work Plan

Uploaded: 01-04-2026

Affidavit

Uploaded: 10-04-2026

CA CERTIFICATE

Uploaded: 09-04-2026

ARCHITECT CERTIFICATE

Uploaded: 10-04-2026

ENGINEERS CERTIFICATE

Uploaded: 09-04-2026

Other

Uploaded: 10-02-2026

Proforma of Agreement for Sale

Uploaded: 12-05-2026

Permits

Orignal Permit NoLDA/LD/21-22/0748
Orignal Permit Date08-12-2021
Valid Upto07-12-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto07-12-2026
End Date09-08-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Jugal Kishore Infrastructure and developers Pvt Ltd
Contractor Address23/13, Gokhaley Marg, Lucknow Up 226001
Architect NamePawan Mishra
Architect Address312, 3rd Floor, Skyline Plaza -1, Sushant Golf City, Lucknow
Architect Licence NumberCA/2004/34606
Structural Engineer NameSarvesh Singh
Structural Engineer AddressPream Nagar, Alambagh, Lucknow
Mobile number(Project Co-ordinator)9007024242

Land Details

Plot

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

5 units

Khasra Details

Total Area

16345.44

175940.68 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-1A
Area(In Sq. Mt.)16345.44

Other Details

Contractor Name (if any)Jugal Kishore Infrastructure and developers Pvt Ltd
Contractor Address23/13, Gokhaley Marg, Lucknow Up 226001
Architect NamePawan Mishra
Architect Address312, 3rd Floor, Skyline Plaza -1, Sushant Golf City, Lucknow
Architect Licence NumberCA/2004/34606
Structural Engineer NameSarvesh Singh
Structural Engineer AddressPream Nagar, Alambagh, Lucknow
Mobile number(Project Co-ordinator)9007024242