Launch Date
Completion Date
RERA ID
25.449481
80.356353
After completion Development Work it will be executed
NA
E/W, GSB/WMM, Painting/Premix carpetting and BM/SDC
NA
For ensuring the drinking water supply to the allottees , tubewell boring , over head tank and distribution network shall be provided
NA
E/W, Concreting, Brick work/RCC Wall, Plaster/Pointing
E/W, Concreting, Brick work, Plaster/Painting, Horticulture
Plantation will be done as per requirment
Fixing of pole and line, laying of cable , Sub station, Light fiting
Community center, post office, police station , would be avilable in the scheme.
NA
Apart from the safe drinking water supply , appropriate arrangement shall be made for refuse disposal
if will provided
NA
In the water supply system of scheme , sufficient no of road side fire hydrants shall be provided
NA
The scheme is well connected by roads to the Naraini road highway
NA
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
0.00 m²
0.00 ft²