26.938181
80.963686
Total Area
101022.00 m²
1087390.71 ft²
Plot Demarcation shall be complete by the fixing of RCC pillar on each unit.
Boundary wall of the entire project shall be constructed
Semi DEnse bituminous concrete (SDBC) roads shall be constructed with the base ofGSB & WMM
Footpaths shall be paving by CC pavers or earthen footpath
Water supply by overhead tank and underground tank with medium density polyethylene piping system
RCC hume pipes for Sewerage system
RCC hume pipes for drainage system
Green spaces will be developed as per approved layout plan
Yes
Electrical infrastructure will be developed as per approved electrical layout
Club will be developed with all the facilities/amenities. The facilities can be utilized on paid basis, and shall not allow ownership of the club building/premises
Yes
Yes
Yes
Not Applicable
Not Applicable
Not Applicable
Not Applicable
-