WE HAVE ONE PLOT OF SIZE 7219 SQM HAVING 1 MAIN ENTRANCE AND 1 EXIT GATE FROM THE 45 M WIDE FRONT ROAD.
2M HIGH AND 230 MM THICK RCC/MS 1 SECTION WORK WHICH GIVE A BEAUTIFUL ICONIC DESIGN BOUNDARY WALL AND WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WIL BE COATED.
CONCRETE /APEX ROAD WILL BE MADE AT THE SITE , THE BASE OF THE ROAD WILL BE FILLED BY RED MURUM , AFTER THAT 2 LAYER OF AGREEGATE WILL BE LAYED TO MAKE SURE THAT THET THE TOAD FROM THE MAIN ENTRANCE / EXIT GATE WE HAVE 100MM THICK 6MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
WE WOULD PROVIDE FOOTHPATH THROUGH BRICK TILE. ALL FOOTHPATH IN THE PROJECT WILL BE IN COMBINATION SIZE THICNESS OF 65MM , 80MM LAID OVER 150MM.
WE WILL PROVIDE PUMPS FOR THE REQUIREMENT OF BLOCKS THROUGH PIPELINES AND PUMPED TO OVER HEAD WATER TANK . THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROM THE SAID OVER HEAD WATER TANK..
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM WHEN COME INTO FORCE.
STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECT WITH MUNICIPAL DRAIN LINE.
WE WILL PROVIDE GREEN AREA WITH THE DIFFRENT ACTIVITIES AND WILL HAVE GAMING FACILITIS FOR KIDS
WE WILL PROVIDE MANY TYPE OF TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LIGHTING, FOUNDATION, STP, PUMP ROOM ETC.
WE WILL PROVIDE COMMUNITY HALL AND CLUB
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
SOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STORED IN GARBAGE ROOM, RECYCLABLE SHALL BE PROCESSED IN THE COMPOSE MACHINE TO MAKE.
WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMTION AND IMPROVE THE GROUND WATER LVEL.
WE WILL USE LED LIGHT FITTING IN INTERNAL AREA AS WELL AS SOLAR LIGHTS. IN PUMP ROOM ALSO ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTOR.
FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT.
PROVISION PROVIDED.
WE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS.
N/S
Showing 5 blocks with 128 units
Total Carpet Area
17748.74 m²
191045.66 ft²
Total Units
128
4 different types
Blocks & Floors
5
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7129.79 m²
76744.35 ft²