WE HAVE PHASE-2 PLOT SIZE IS 7219 SQM FOR 5 TOWERS HAVING 1 MAIN ENTRANCE AND 1 EXIT GATE THE 45M WIDE FRONT ROAD
2M HIGH AND 230 MM THICK RCC / MS 1 SECTION WORK WHICH GIVE A BEAUTIFUL ICONIC DESIGN BOUNDARY WALL AND WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER THAT TWO COAT OF PAINTS WILL BE COATED.
CONCRETE /APEX ROAD WILL BE MADE AT THE SITENTHE BASE OF THE ROAD WILL BE FILLED BY RED MURUM. AFTER THAT 2 LAYER OF AGREEGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD FROM THE MAIN ENTRANCE/ EXIT GATE WE HAVE 100MM THICK 6MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
WE WOULD PROVIDE FOOTHPATH THROUGH BRICK TILE. ALL FOOTHPATH IN THE COMPLEX WILL BE IN COMBINATION .SIZE THICKNESS OF 65MM , 80 MM LAID OVER 150 MM .
WE WILL PROVIDE PUMPS FOR THE REQUIREMENT OF BLOCKS THROUGH PIPELINES AND PUMPED TO OVER HEAD WATER TANK. THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROMTHE SAID OVERHEAD WATER TANK
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO THE STP AND AFTER TREATEMENTS RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM . WHEN COME INFOR FORCE..
STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECT WITH MUNICIPAL DRAIN LINE.
WE WILL PROVIDE GREEN AREA WITH THE DIFFRENT ACTIVITIES AND WILL HAVE GAMING FACILITIES FOR KIDS
WE WILL PROVIDE MANY TYPE OF TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRANSFORMER, HT PANEL , LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNDATION, STP, PUMP ROOM ETC.
WE WILL PROVIDE COMMUNITY HALL AND CLUB
MODELAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND AFTER TREATMENT RE-USE IN FLUSH AND GARDEN. OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WEHN COME INTO FORCE.
COLLECTION FROM DOOR TO DOOR
WE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.
WE WILL USE LED LIGHTS FITTING IN INTERNAL AND EXTERNAL AREA AS WELL AS SOLAR LIGHTS. IN PUMP ROOM ALSO ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTOR.
FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENTS.
PROVISION PROVIDED
WE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS
N/A
Showing 5 blocks with 128 units
Total Carpet Area
17696.80 m²
190486.59 ft²
Total Units
128
6 different types
Blocks & Floors
5
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7219.79 m²
77713.10 ft²