Have queries on this Project?
26.81846
81.00012
Showing 6 blocks with 209 units
Total Carpet Area
25467.29 m²
274127.36 ft²
Total Units
183
5 different types
Blocks & Floors
6
19 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14439.26 m²
155422.75 ft²
Group Housing 2 in Emaar Gomti Greens Integrated Township
RCC & Exposed B.W
Paver & Black Top / C.C
Paver
Tube-well U.G.T. & O.G.T.
Sewer Line and STP
Covered Drain and Catch Basins
Internal Court Yard
Yes
Electric Supply Shall be from Emaar Gomti Greens Substation
Community Hall & Club
STP
Collection from Door to Door
Rain Water Harvesting. STP Treated Water Used in Flush & Gardening
Solar Water Heater. Street Light Solar Panels
Fire Fighting / FA & PA System
Provision Provided
Fire Staircases Provided in Each Tower
NA
Oranje Castel Phase-I Tower G to L is located in Lucknow.
Yes. Oranje Castel Phase-I Tower G to L is registered under UPRERAPRJ6917 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Oranje Castel Phase-I Tower G to L is 27 September 2021.
Oranje Castel Phase-I Tower G to L is developed by SURAJ INFRAVENTURES PVT LTD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.