One Group The Saavira is an under-construction, ultra-boutique residential tower by One Group (registered applicant One City Infrastructure Pvt Ltd) in Sector 48, Gurgaon, on the Sohna Road belt. The honest way to describe it: a single 25-storey tower of just 72 large 3 and 4 BHK homes on a compact 0.86-acre plot, positioned as a premium, low-inventory, privacy-first address rather than a large amenity-led township. For a buyer, the draw is exclusivity and a genuinely premium fit-out at a Sohna Road location; the trade-off is the small land parcel, which limits open space and on-site amenity scale, and a developer that is a smaller name in Gurgaon's luxury segment. The current rate is around Rs 19,000 per sqft.
Registered with HARERA under RERA-GRG-1744-2024 (received 3 October 2024), The Saavira is a single building of 72 units rising to 25 floors on 0.8615 acre, with a FAR of about 3.62. Homes are 3 and 4 BHK, with super areas from 2,190 to 2,960 sq ft. On the 2,960 sq ft 4 BHK, the carpet area is 1,742 sq ft, a carpet efficiency of about 59%, which is on a strong side, and each home comes with two car parks. The density works out to about 83.72 units per acre, which sounds high but reflects a single tall tower on a small plot rather than a crowded multi-tower layout. The land was allotted by HSVP (plot GH-1).
The specification is where The Saavira makes its real case, and it is genuinely premium for the segment: Italian or imported marble in the living, dining and family lounge and in the private apartment lift lobbies, laminated wooden flooring in bedrooms, Kohler/Grohe/Roca (or equivalent) bathroom fittings, split air-conditioners provided, modular electrical fittings, low-VOC acrylic emulsion paint, UPVC glazing and high-speed elevators. Singapore-style design, 14-foot balconies, a private lift per home, smart-home features and rooftop amenities; treat these as developer claims and confirm them against the approved building plans.
A Genuinely Boutique Floor Plate
The most distinctive thing about The Saavira is how few homes share each floor. The registered floor plan shows one 4 BHK and one 3 BHK per floor, which means roughly two families per level across the 25-storey tower, the basis for the project's privacy and exclusivity pitch and its marketed private-lift-per-home concept. For a buyer who values low-density living and minimal shared circulation, this is the project's strongest structural feature. The flip side is equally important to state plainly: on a 0.86-acre single-tower plot, the RERA land-usage filing records the club house area as zero, so unlike a multi-acre community there is limited land for a large clubhouse, sports facilities or expansive landscaped grounds.
Why Sector 48, Gurgaon
Sector 48 is an established residential pocket on the Sohna Road corridor, well connected to Golf Course Extension Road, the Southern Peripheral Road and NH-48, with existing schools, hospitals, retail and offices nearby. The location case here is maturity rather than frontier growth: unlike newer corridors, Sector 48 is already built up and serviced, which suits a buyer who wants an exclusive home in a settled neighbourhood with everyday infrastructure in place. Sohna Road has seen steady price growth, but any expectation of rental income or capital appreciation should be treated as a projection, not a guarantee, particularly for a small-inventory project where resale liquidity depends on a narrow buyer pool.
One Group The Saavira: Specifications at a Glance
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 30-09-2024
Uploaded on: 30-09-2024
Uploaded on: 03-10-2024




| Particulars | Expenditure (in Lakhs) |
|---|---|
| Other | 0 |
| Shopping area | 0 |
| Roads & Pavements | 0 |
| Water Supply System | 0 |
| Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 |
| Electricity Supply System | 0 |
| Clubhouse/community centres | 0 |
| Sewerage treatment & garbage disposal | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.92 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.63 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.83 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.67 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.79 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.92 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.63 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.83 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.67 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.79 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.92 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.63 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.83 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.67 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.79 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.92 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.63 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.83 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.67 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.79 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.92 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.63 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.83 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.67 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.79 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electricity Supply System | 2.92 | 2.92 | 2.92 | 2.84 |
| Electrification Cost | 20.83 | 20.83 | 20.83 | 20.83 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 0.63 | 0.63 | 0.63 | 0.51 |
| Parks and Playgrounds | 6.25 | 6.25 | 6.25 | 6.25 |
| Rain water harvesting | 0.5 | 0.5 | 0.5 | 0.5 |
| Renewable energy system | 0.83 | 0.83 | 0.83 | 0.91 |
| Roads & Pavements | 11.79 | 11.79 | 11.79 | 11.79 |
| STP | 1.67 | 1.67 | 1.67 | 1.59 |
| Security and Firefighting services | 7.29 | 7.29 | 7.29 | 7.29 |
| Sewerage treatment & garbage disposal | 0.71 | 0.71 | 0.71 | 0.71 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0.63 | 0.63 | 0.63 | 0.63 |
| Street Light | 0.33 | 0.33 | 0.33 | 0.33 |
| Underground Water Tank | 4.79 | 4.79 | 4.79 | 4.83 |
| Water Supply System | 0.81 | 0.81 | 0.81 | 0.81 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Clubhouse/community centres | 0 | 0 | 0 | - |
| Electricity Supply System | 0 | 0 | 0 | - |
| Electrification Cost | - | - | - | - |
| Other | 0 | 0 | 0 | - |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | - |
| Rain water harvesting | - | - | - | - |
| Renewable energy system | - | - | - | - |
| Roads & Pavements | 0 | 0 | 0 | - |
| STP | - | - | - | - |
| Security and Firefighting services | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | - |
| Shopping area | 0 | 0 | 0 | - |
| Storm Water Drainage | 0 | 0 | 0 | - |
| Street Light | - | - | - | - |
| Underground Water Tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | - |
One The Saavira is in Sector 48, Gurgaon, on the Sohna Road belt, well connected to Golf Course Extension Road, the Southern Peripheral Road and NH-48, in an already-established residential neighbourhood.
Yes, One The Saavira is registered with HARERA under RERA-GRG-1744-2024, received on 3 October 2024. Buyers should verify it on the HARERA portal, including the Environment Clearance (applied but not yet received) and the roads NOC (pending).
One The Saavira is developed by One Group, with One City Infrastructure Pvt Ltd as the registered applicant. One Group is a smaller name in Gurgaon's luxury segment than the large listed developers, so a buyer is relying on this single boutique project's execution rather than a long Gurgaon luxury delivery record; checking the developer's past completions is worthwhile.
One The Saavira offers 3 and 4 BHK apartments, with super areas from 2,190 to 2,960 sq ft. The 2,960 sq ft 4 BHK has a carpet area of about 1,742 sq ft.
One The Saavira is a single tower of 72 units rising to 25 floors (G+25), with one 4 BHK and one 3 BHK per floor, roughly two homes per level, which is the basis of its low-density, high-privacy positioning.