Have queries on this Project?
26.715914
80.938372
Total Area
15907.00 m²
171221.36 ft²
Demarcation of project, completed at site
Boundary wall will be constructed for Villa only , No boundary wall will be constructed for floors or as per requirement and designed by promoter
9/12 mtr wide Bitumen road will be constructed as per approved layout, as per requirement and designed by promoter
Both side of road , foothpath will be developed, width 2.0 or 3.0 mtr as per requirement and designed by promoter
Water Supply including Drinking water facilities will be provided by promoter through common Over Head Tank as constructed at project Hi-Tech Township
Common S.T.P will be constructed by promoter , for high tech township at site for sewer disposal
Drainage system will be developed and connected with RWH and overflow will be connected with Existing Drains.
Common Parks/ Green area available in Hitech- Township and will be developed as per approved plan and requirements.
Required tree will planted on Road Berms and parks as per requirement and norms.
Common ESS will be developed for Hi- Tech Township . Electric supply will be provided from ESS . Street Lights will be fixed at road berms as per requirements and design
Common Community Buildings will be provided for Hi-Tech Township
S.T.P. will be constructed at site, and treated water will be used in Irrigation of green areas
Solid Waste management and disposal system will be provided as per requirement and Govt Norms
Water Conservation System will be provided as per Govt Norms
Energy Management System Including Use if Renewable Energy will be provided as per Govt. Norms
Required Fire NOC received and Fire Protection and Fire Safety System will be provided as per Design and Norms
Common social infrastructure and public amenities including public health services will be provided in Hitech Township
N/A
As per specification and approved Map all works will be developed
Omaxe Metro City Phase 4 is located in Lucknow.
Yes. Omaxe Metro City Phase 4 is registered under UPRERAPRJ872560 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Omaxe Metro City Phase 4 is 15 February 2028.
Omaxe Metro City Phase 4 is developed by OMAXE GARV BUILTECH PRIVATE LIMITED (FOMERLY GARV BUILDTECH PRIVATE LIMITED)OMAXE LIMITED.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.