RERA Received Date
Completion Date
RERA ID
26.7153
80.9306
Demarcation of Project to be done at site.
Boundary wall will be constructed by Brick work/ MS Railing as per requirement and designed by promoter.
18 mtr road Will be developed by RCC/ Interlocking pavers/Bitumen as per approved layout , as
Both side of road, footpath will be developed, width 1.0 to 1.5 mtr. as per requirement and designed by promoter.
Water supply including drinking water facilities will be provided by promoter through Roof tank/ Bore well
sewer line will be layed under the road and will be connect to main sewer line
Drainage system will be developed and connected with RWH and over flow will be connected with Existing Drains.
Common Parks / Green area will be developed 4791 sq yd
in Park more than 25 numbers of tree planted
Common ESS developed for Metrocity Township . Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirements and design .
common community building will be designed and constructed by promoter.
common S.T.P. Will be constructed by promoter and treated water will be use in Irrigation of green areas and as per Govt. Norms
Solid waste management and disposal system will be provided as per requirement and Govt. norms
Water conservation system will be provided as per Govt. Norms
Energy management system will be provided as per Govt. norms
Fire Safety System will be provided as per approval, Design and Norms.
NA
As per Norms
NA
Total Area
2268.00 m²
24412.53 ft²