26.728328
80.956795
Showing 1 blocks with 231 units
Total Carpet Area
21469.97 m²
231100.61 ft²
Total Units
764
2 different types
Blocks & Floors
1
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
46430.00 m²
499767.88 ft²
Demarcation of this Project Completed at site by barricading of GI Sheet. Project area, shape size as per approved map by Lucknow Developmet Authority.
As this is a commercial Project, So Boundary wall will not be constructed.
7.5/9.0/12.0 mtr wide(as per drawing) Road will be constructed by RCC.
Footpath will be developed as per drawing/design by using Tile/Interlockings for walking area.
24 hour water supply including drinking water facilities will be provided by Promoter through submercible pump or OHT on terrace.
STP will be constructed at site for sewer disposal and treated water will be used in flushing or irrigation of parks/green area.
Drainage line will be constructed and connected with RWH and overflow will be connected with existing drains.
Achieved ground coverage area 32.97 percent, Green area/Parks will be Developed as per plan.
The trees will be planted at suitable location as per requirements.
Electric supply will be provided from ESS of Hi-Tech Township. Street lighting will be fixed.
This is a commercial building, so community building not available here.
STP will be constructed within the Project, for sewer disposal and treated water will be used in flushing or irrigation of parks/green area.
Solid Waste Management and disposal system will be provided as per govt norms.
Rain Water Harvesting will be provided at site as per required design/norms.
Will be provided as per govt norms.
Fire Noc Received, and all fire work will be provided as per NOC and norms.
N/A
Emergency evacuation services will be provided as per Fire NOC and norms.
N/A
Omaxe Metro City Commercial-2 Phase-4 is located in Lucknow.
Yes. Omaxe Metro City Commercial-2 Phase-4 is registered under UPRERAPRJ461785 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Omaxe Metro City Commercial-2 Phase-4 is 31 July 2028.
Omaxe Metro City Commercial-2 Phase-4 is developed by OMAXE GARV BUILTECH PRIVATE LIMITED (FOMERLY GARV BUILDTECH PRIVATE LIMITED).
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.