RERA Received Date
Completion Date
RERA ID
26.43
80.57
Demarcation of project to be done at site.
Boundary wall will be constructed by brick work / MS railing as per requirement and designed by promoter.
9 meter wide internal road will be developed by RCC/Interlocking pavers/Bitumen
Both side of road, 1.5 mtr footpath will be developed as per requirement .
24 hours Water supply including drinking water facilities will be provided by promoter through roof tank/bore well.
Will be constructed by promoter
Drainage system will be developed and connected with RWH over flow will be connected with existing Drains.
Common Park/Green area will be developed as per approved plan and requirements.
Will be planted as per norms requirements
Common ESS developed for Metrocity Township. Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirements and design.
NA
S.T.P will be constructed by promoter and treated water will be use in Irrigation of green areas and as per govt. norms.
Solid waste management and disposal system will be provided as per requirement and govt. Norms
Water conservation system will be provided as per govt. Norms
Energy management system will be provided as per govt. norms
Fire safety system will be provided as per approval, Design Norms
NA
Will be provided as per aproval, design norms
NA
Showing 1 blocks with 89 units
Total Carpet Area
10301.00 m²
110878.93 ft²
Total Units
360
3 different types
Blocks & Floors
1
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8910.00 m²
95906.35 ft²