Launch Date
Completion Date
RERA ID
25.39000545927248
81.8903247461407
Demarcation of project has been done as per layout plan
No Boundary wall as developed a commercial
6 meter wide drive way/ Road work will be constructed by promoter as per layout plan with inter lock tile/Black top
Footpaths will be constructed on roadside
24 hour water supply and drinking water facilities will be developed as per plan. Water supply will be provided through UGT/OGT service
Sewer system including STP will be constructed at site as per norms/requirement and recycle water will be used in park/green area etc
underground drain will be provided and connected to existing drainage system
Green area 379 sq mtr / as per sanctioned drawing will be developed
36 trees will be planted in green area as per approved layout
Street lighting will be provided and electric supply plan will be laid by the promoter
na
STP will be constructed at site and disposal as per requirement
Solid waste management and disposal system will be provided as per requirement
Rain water harvesting will be developed as per layout plan
Energy Management System including use of renewable energy will be provided as per govt norms and designed by the promoter
FIRE NOC received, fire protection and fire safety system will be provided as per NOC
NA
emergency evacuation services will be provided as per approved layout plan
If required then will be provided as per requirements
Showing 1 blocks with 7 units
Total Carpet Area
481.33 m²
5180.99 ft²
Total Units
31
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
18030.00 m²
194073.12 ft²