Demarcation fo Project to be done at site as per Approved Layout. Site is surronded by 18 mtr road from North, Kisan path road from South and other plots by East and master plan road in west.
1.5 - 2.4 m high and 200 mm thick Boundary wall designed or with MS railing as per approved design. Brick Work of 9 inches and rcc work in column and beam may be used as per design,
7.5 mtr wide drive-way, 6 mtr wide fire tender path by Bitumen road/CC will be constructed as per approved layout or as per requirement and designed by promoter.
Both side of road, Footpath will be developed width 1.0 to 1.5 mtr. with tiles pavers or equivalent finishes or as per requirement of landscape design.
All floors must be equipped with domestic water for sanitary activities and STO (Sewage Treatment plant) treated water for the flushing system. Individuals may utilize an RO (reverse osmosis) system as per their specific requirements for potable purposes. To facilitate this, water tanks are being constructed underground and on the terrace. Separate tanks are designated for fire water.
Common S.T.P will be constructed by promoter, for GH-2, at site for Sewer disposal.
Drainage system will be developed and connected with RWH and over flow will be connected with Existing Drains.
Common Park.Green area approx 2300 sqm will be developed in GH-2. And will be developed as per approved plan and requirements.
Required Tree approx 100-120 nos, will be planted in GH-2 within parks, road side and boundary as per requirement and norms.
Common ESS developed for Metro city township. Electric supply will be provided from ESS. Street lights will be fixed at road berms as per requirements and design.
Common community building as per approved layout, will be provided for GH-2
Centralized Sewerage system for entire Group Housing shall be connected to STP. All sewerage water after treatment shall be used in Irrigation of green areas and as per Govt. norms.
Project shall have waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas.
A well designed rain water harvesting system as per govt. norms shall be provided or the Group Housing to conserve water by ensuring adequate nos. of recharge pits
Energy management system will be provided as per Govt. Norms
All Fire norms shall be followed as per NBC code and approval of fire department. Fire sprinklers, detectors with pumps are provided as per norms.
NA
Fire Staircase is provided in the each buildingl with fire resistant door and Adequate signage is also provided.
As per Specification finalize by and approved map all works will be developed.
Showing 4 blocks with 78 units
Total Carpet Area
18860.00 m²
203007.15 ft²
Total Units
152
2 different types
Blocks & Floors
4
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9379.00 m²