Have queries on this Project?
26.725985
80.943851
Showing 4 blocks with 159 units
Total Carpet Area
32112.00 m²
345650.36 ft²
Total Units
318
2 different types
Blocks & Floors
4
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13481.00 m²
145108.14 ft²
Demarcation of project to be done at site.
Boundary wall will be constructed by brick work/MS railing as per requirement and designed by promoter.
Internal drive way 6 mtr wide, will be developed by RCC/Interlocking paver/Bitumen as per approved layout, as per requiremet and designed by promoter.
Both side of road, Footpath will be developed, width 1.0 to 1.5 mtr, as per requirement and designed by promoter.
Water supply including drinking water facilities will be provided by promoter through roof tank/bore well.
Common S.T.P will be constructed by promoter, for GH-2, at site for Sewer disposal.
Drainage system will be developed and connected with RWH over flow will be connected with Exiting Drains.
Common parks/green area approx 2300 sqm will be planted in GH-2 within parks, road side and boundary, as per requirment and norms.
Required Tree approx 100-120 nos, will be planted in GH-2 within parks, road side and boundary, as per requirement and norms.
Common ESS developed for metrocity township. electric supply will be provided from ESS. Street light wil be fixed at road berms as per requirement and design.
Common community building as per approved layout, will be provided for GH-2
S.T.P will be constructed for GH-2, and treated water will be use in Irrigation of green areas and as per Govt. norms.
Solid waste management and disposal system will be provided as per requirement and Govt. norms
water conservation system will be provided as per Govt. Norms
Energy management system will be provided as per Govt. Norms
Fire safety system will be provided as per approval, design Norms
N/A
As per Norms
As per specification finalize by approved map all works will be developed.
Omaxe Cassia GH II, Phase I is located in Lucknow.
Yes. Omaxe Cassia GH II, Phase I is registered under UPRERAPRJ344049/07/2024 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Omaxe Cassia GH II, Phase I is 8 April 2029.
Omaxe Cassia GH II, Phase I is developed by OMAXE GARV BUILTECH PRIVATE LIMITED (FOMERLY GARV BUILDTECH PRIVATE LIMITED).
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.