Have queries on this Project?
Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Launch Price
Current Price
RERA ID
Omara by Trehan Iris is a luxury residential project by Trehan Promoters & Builders (Trehan Iris) in Sector 80, Manesar, Gurugram. It is a large-format, low-density development on the HSIIDC township belt, aimed at buyers who want genuinely spacious 3 and 4 BHK homes in a planned, all-private sector rather than a high-rise packed onto a tight parcel. Registered with HARERA under RERA-GRG-2092-2025, the project sits across 5.08 acres with 3 towers rising to 40 floors and 320 residences, at a medium density of about 63 units per acre. The configurations are large 3 BHK and 4 BHK homes with super areas from 3,050 sq ft to 4,100 sq ft and a healthy carpet efficiency of around 57%. An entry 3 BHK works out to around ₹6.56 crore on base price.
Why Sector 80 and the HSIIDC Township
The strongest part of the case here is the location, and specifically the kind of sector this is. Sector 80 is an HSIIDC-planned township, which is a meaningfully different product from a typical Gurugram sector. The infrastructure is designed up front rather than retrofitted: 30-metre wide internal roads, its own 2 acre clubhouse, a 10 acre forest area, a school, a dedicated fire department, and a fully worked-out drainage system already planned into the layout.
Just as importantly, it is an all-private-development township with no village settlement inside it, which keeps the character consistent and is a real differentiator in a city where many sectors are a patchwork. It sits in close proximity to NH-48, the Delhi-Jaipur Expressway, giving it strong onward connectivity. For a buyer thinking long term, a pre-planned HSIIDC township with this kind of built-in infrastructure is the sort of address that tends to come into its own as it matures, and there is real reason to be positive about how Sector 80 develops from here.
Specifications at a Glance
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupUploaded on: 24-12-2025
Uploaded on: 03-02-2026
Uploaded on: 30-12-2025
Uploaded on: 03-02-2026




| Particulars | Expenditure (in Lakhs) |
|---|---|
| Other | 0 |
| Boundary wall | 60 |
| Shopping area | 0 |
| Street Lighting | 10.3 |
| Roads & Pavements | 0 |
| Water Supply System | 18 |
| Storm Water Drainage | 0 |
| Parks and Playgrounds | 0 |
| Electrical sub station | 20 |
| Electricity Supply System | 0 |
| Security and Fire Fighting | 10 |
| Clubhouse/community centres | 0 |
| Sewerage treatment & garbage disposal | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | - | - | - | - |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | - | - | - | - |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | - | - | - | - |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | - | - | - | - |
| Security and Fire Fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | - | - | - | - |
| Under Ground Water Tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | - | - | - | - |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | - | - | - | - |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | - | - | - | - |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | - | - | - | - |
| Security and Fire Fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | - | - | - | - |
| Under Ground Water Tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | - | 20.4 | 20 | 30 |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | - | - | - | - |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | - | - | - | - |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | - | - | - | - |
| Security and Fire Fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | - | - | - | - |
| Under Ground Water Tank | - | - | - | - |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | 30 | 30 | 30 | 40 |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | 0 | 0 | 40 | 30 |
| Electricity Supply System | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | - | - | - | - |
| Roads & Pavements | 0 | 0 | 0 | 0 |
| STP | - | - | - | - |
| Security and Fire Fighting | - | - | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | 0 | 10 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | - | - | - | - |
| Under Ground Water Tank | 0 | 0 | 25 | 20 |
| Water Supply System | 0 | 0 | 0 | 0 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | 50 | 60 | 40 | - |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | 30 | 30 | 0 | 0 |
| Electricity Supply System | 10 | 20 | 30 | 40 |
| Other | 0 | 0 | 0 | 0 |
| Parking | 10 | 20 | 30 | 10 |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | - | 10 | 20 | 10 |
| Roads & Pavements | 0 | 0 | 30 | 30 |
| STP | 23 | 25 | 25.62 | - |
| Security and Fire Fighting | - | - | 50 | 80 |
| Sewerage treatment & garbage disposal | 10 | 20.57 | 20 | 6.77 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 10 | 10 | 10 | 1.66 |
| Street Light | - | - | - | - |
| Under Ground Water Tank | 25 | 25 | 23.29 | 5 |
| Water Supply System | 0 | 10 | 21.12 | 20 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | - | - | - | - |
| Clubhouse/community centres | 0 | 0 | 0 | 0 |
| Electric Sub station | - | - | - | - |
| Electricity Supply System | 50 | 25 | 25 | 25 |
| Other | 0 | 0 | 0 | 0 |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | 0 | 0 |
| Rain Water Harvesting | 10 | - | - | - |
| Roads & Pavements | 40 | 20 | 20 | 20 |
| STP | - | - | - | - |
| Security and Fire Fighting | 50.37 | 50 | 49 | 20 |
| Sewerage treatment & garbage disposal | 3 | 3.58 | 0 | 0 |
| Shopping area | 0 | 0 | 0 | 0 |
| Storm Water Drainage | 0 | 0 | 0 | 0 |
| Street Light | 9.7 | 20 | 10 | 5 |
| Under Ground Water Tank | - | - | - | - |
| Water Supply System | 20 | 10 | 5 | 5 |
| Particulars | Jan-Mar | Apr-June | July-Sep | Oct-Dec |
|---|---|---|---|---|
| Boundary Wall | - | - | - | - |
| Clubhouse/community centres | 0 | 0 | - | - |
| Electric Sub station | - | - | - | - |
| Electricity Supply System | 25 | 30 | - | - |
| Other | 0 | 0 | - | - |
| Parking | - | - | - | - |
| Parks and Playgrounds | 0 | 0 | - | - |
| Rain Water Harvesting | - | - | - | - |
| Roads & Pavements | 10 | 5 | - | - |
| STP | - | - | - | - |
| Security and Fire Fighting | 20 | 20 | - | - |
| Sewerage treatment & garbage disposal | 0 | 0 | - | - |
| Shopping area | 0 | 0 | - | - |
| Storm Water Drainage | 0 | 0 | - | - |
| Street Light | 5.84 | - | - | - |
| Under Ground Water Tank | - | - | - | - |
| Water Supply System | 0 | 0 | - | - |
Sector 80, Manesar, Gurugram, inside an HSIIDC-planned township with direct access to NH-48.
Yes, under HARERA registration RERA-GRG-2092-2025, received 30 December 2025. We recommend verifying it directly on the HARERA portal.
It is an HSIIDC-planned township with pre-designed infrastructure, 30-metre internal roads, a clubhouse, fire department, school, forest area and a fully planned drainage system. It is an all-private-development sector with no village settlement inside it, close to NH-48.
Large-format 3 BHK and 4 BHK residences, with super areas from 3,050 sq ft to 4,100 sq ft and a carpet efficiency of around 57%.
The current rate is around ₹21,500 per sqft, placing an entry 3 BHK near ₹6.56 crore on base price. Final all-in cost depends on unit, floor and add-ons, and is shared on request.
Developed by
4 Projects
EXECUTIVE SUMMARY Trehan IRIS is the branded real estate arm of the Trehan Group, a multi-generational construction and development conglomerate with roots dating to the early 1930s in Delhi. The group began as a governm…
Know More about Trehan IRIS