Layout of site according to both the survey and the approved layout plan using a total station. Plots will be very well demarcated at the site. Demarcation of plots is done through brick work in zig zag pattern
In this Project there will be Precast boundary wall of 6 ft height is being cconstructed and there will be project logo in the center which give next level of viewing experinace to the clients
In this project roads finished with trimix / concrete pavers as per design and laid over compacted earth granular subbase (GSB) WBM PCC (1 4 8) and sand bed wide roads 7.5 Mtr to 30 Mtr
In this Project there footpaths will be made of Interlocking Concrete Pavers
The potable water supply of desired quality and purity shall be ensured by tapping underground water. The Primary treatment facility shall be ensured before making it supplied to the use of people
In this Project an efficient designed sewerage system connected to STP and all sewer water shall go to the STP to be developed on this Project
In this Project an efficient underground drainage system proposed. The surface runoff from the roads, open space and areas other than roof tops will be transported through the system to the nearest existing water body for harvesting and the overflow from the water bodies will disposed in the existing darin
Greenery development in this township Project is proposed in the parks. These green space are provided with the sectors creating healthy and moderate environment for the residents of township. Rich planation kids area will be also there in this Project
Plants of local species trees will be there on boundary roads parks and on common areas 1 mtr to 4 mtr high plants and trees along the roads of evergreen nature
The proposed township shall supply electric supply through 33 KV sub-station from where power shall be supplied at 11 KV level through various underground 11 KV feeders to the distribution transformers of 11 KV / 433 KV variation and then the LT underground distribution system Electric cabling we will used LED lights fitting in external areas
In this Project various community area and various activities will be proposed in this project
Treatment and disposal system of sewage and sullage water will be treated in the STP proposed in the various zone in the township Under ground drainage system.
As all the waste will be segregated at source only after that all the organic waste generated in this township will be used after its treatment to make it zero-waste discharge township however all the e-waste and toxic water and recycleable waste will be handed over to the agency suggected by muzaffarnagar Developemt authority else we will hand over such waste to the hired government approved solid waste managment agency from the market
Every household will get piped water supply through a designed system and no area will be allowed to install their own individual system of water supply
Solar lights in the Park and common area and EWS LIG area will be provided partially to save the energy
a reserve for fire fighting has proposed in the township
In this New Township social infrastructre such as schools Community centers club Post office etc are provided to make this township convenient for living
Sufficient open space provided in the township for the gathering of people in emergency