Have queries on this Project?
29.233550
77.42349
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
144577.00 m²
1556212.37 ft²
Layout of the site according to both the survey and the approved layout plan using a total station.
Precast boundary wall of 6 ft height.
Road finished with trimix/ concrete pavers as per design and laid over compacted earth, granular subbase (GSB), WBM, PCC (1.4.8) and sand bed.
Interlocking Concrete Pavers
The portable water supply of desired quality and purity shall be ensured by tapping underground water. The primary treatment facility shall be ensured before making it supplied to the use of people.
An efficiently designed sewerage system connected to STP.
Efficient underground drainage system proposed. The surface runoff from the road, open spaces and area other than roof tops will be transported through the system to the nearest existing water body for thy harvesting and the overflow from the water bodies will be disposed off in the existing drain.
Greenery Development in township is proposed in the park. These green spaces are provided with the sectors creating healthy and moderate environment for the residents of township.
Plant local species trees on the boundaries, roads, parks and on the common areas.
The proposed township shall supply electric supply through 33 KV Sub- Station from where power shall be supplied at 11 KV level through Various underground 11 KV Feeders to the distribution transformers of 11 KV/433 KV variation and the LT underground distribution system.
Community building with various community activities proposed in township.
Treatment and disposal system of sewage and sullage water shall be treated in the STP proposed in the various zones in the township.
As all waste shall be segregated at source only after that all the organic waste generated in the township shall be used in the township after its treatment to make it zero waste discharge township. however the E-waste and toxic waste and recyclable waste shall be handed over to agency suggested by MDA, else we shall hand over such waste to the hired government approved solid waste management agency .
Every household shall get piped water supply through a designed system and no area shall be allowed to install their own individual system of water supply. i.e Jet pumps, Hand Pumps, Individual Borwell
Solar light in the park/common and EWS/LIG area shall be provided partially to save the energy.
A reserve for fire fighting has proposed in the township.
In the new Township social infrastructure such as school , Community centres, Club, Post office, etc are provided to make this township convenient for living.
Sufficient open spaces provided in the township for the gathering of people in emergency.
N.A