We have one plot of size 2937 sq. mtr.having 1 main entrance gate from the 18 m wide front road.
2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
We will provide R.C.C. road all along the periphery for vehicular traffic.
We will provide 1.5 mtr. Footpath along road.
Two boreholes 300 ft. Deep. Water pumped to overhead tanks & supplied to units through gravity. The system will be part and parcel of the UGWST to be provided for fire fighting system.
Sewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority.
Storm Water from hard surfaces at the rate of 100 percent & 20 percent from the green areas shall be used for rain water harvesting & surplus water shall be drained to the network provided by Development Authority.
Parks shall be provided at appropriate places with grass & seasonal flowers vertical plantations shall be developed along boundary walls.
Required numbers of trees shall be planted along with the boundary wall giving shade to the parked cars.
Electric supply shall be harnessed from the board. Transformer, HT & LT panels shall be designed with DG back up for all services and units.
There is no separate community building as such but community spaces like club, cafeteria, gym, swimming pool etc will be provisioned and will be available to residents on demand.
Sewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority.
Solid waste shall be bagged & collected floor wise. Collected waste shall be taken up to the point of collection from where it shall be taken to the disposal site by the arrangement of Development Authority.
All appliances provided shall be of low water consumption. Surface drainage shall be taken to first level through rainwater harvesting system.
All equipments to be used in the complex shall be of the low energy consumption. LED lights & solar lights along with solar energy shall be as per government rules.
All provision stipulated by NBC-16 shall be followed. Sprinkler system shall be used in basement.
NA
Area shall be marked on ground where people can collect in case of emergency
NA
Showing 1 blocks with 58 units
Total Carpet Area
8429.10 m²
90729.99 ft²
Total Units
58
3 different types
Blocks & Floors
1
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2937.00 m²
31613.57 ft²