Launch Date
Completion Date
RERA ID
26'54'50.0 N
26'54'54.0 N
Already done
Constructed
proper road connectivity is provided till the entrance of the building
constructed
Submersible water pump / ground water facility
Sewage system
Drainage system available
Park space
Will be planted after the construction of apartments
Electric Poles will be installed after the construction and completion of the building
NO
will be installed after the construction and completion of the building
will be installed after the construction and completion of the building
NO
solar panels will be installed after the construction and completion of the building
Yes it is provided and more fire extinguishers will also be installed on each and every floor
within 500 meters of the site
Emergency evacuation stairs provided in the buildings
security guards round the clock. Passenger lifts would be installed in the building
Showing 3 blocks with 15 units
Total Carpet Area
5410.80 m²
58241.31 ft²
Total Units
120
2 different types
Blocks & Floors
3
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
34890.00 m²
375552.47 ft²