NewActive

NEW GARDEN

Lucknow, Uttar Pradesh
19-06-2023
Launch Date
New
Type
31-12-2025
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

31-12-2025

RERA ID

UPRERAPRJ952438

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)10131.12
Project NameNEW GARDEN
Registration Fee (in Rs.)56500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)31
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date19-06-2023
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)1079
Proposed Completion Date31-12-2025

Location

Latitude

26.53

Longitude

81.427

Bank Details

Account Details
Name of the AccountSpring Garden Collection Account for New Garden
Account Number7177002900001163
Bank NamePunjab National Bank
Branch NameAshok Marg Branch
Branch AddressPNB 10, Ashok Marg, Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodePUNB0717700
Separate Account Details
Name of the AccountSpring Garden Separate Remittance Bank Account for New Garden
Account Number7177002900001172
Bank NamePunjab National Bank
Branch NameAshok Marg Lucknow
Branch AddressPNB 10, Ashok Marg, Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodePUNB0717700
Transaction Account Details
Name of the AccountSpring Garden RERA Transaction Account for New Garden
Account Number7177002100004492
Bank NamePunjab National Bank
Branch NameAshok Marg, Lucknow
Branch Address10, Ashok Marg, Lucknow
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodePUNB0717700

Development Works

Demarcation of Plots

Plot demarcation is one of the earliest activities it defines property boundaries, parcel shapes and plot locations that the owner of the property is interested to know concerning his/her plot/property. In our project all plots are well demarcated as per approved plan and easy for physical handing over the plots.

Boundary Wall

A boundary wall is " any wall constructed on, above or over the physical border between two properties so that it stands on or occupies space on both properties at least partially". The boundary wall offers the property and its occupants a sense of protection and security. Below is a specification of our project boundary wall- 1. Height of the boundary wall is 1860 MM. 2. Width of the boundary wall is 115 MM.

Road Work

Project has 9.0 mtrs and 7.5 mtrs internal road, the approach to the plot in throughout of site is well managed for vehicle/pedestrian movement has been designed to minimize conflicts between vehicles and pedestrians. Maximum utilization of the site has been planned. Every plot is provided with approach from vehicular road. Pedestrian pathways which are traffic free connect the plots with the road as well as make the movement uninterrupted. A well-planned road network is proposed within the project premises. In our project we provide metal road with bituminous cover/high strength concrete pavers/tiles will be used as per designed by architect for internal road.

Footpaths

Comfort, continuity, and safety are the governing criteria for the design and construction of pedestrian facilities. A foothpath is a type of route designed just for pedestrians and not for other types of traffic such as cars or bicycle. We will provide foothpath as per design and the requirement.

Water Supply Including Drinking Water Facilities

Safe drinking water, sanitation and hygiene are fundamental to improving standard of living for people. In our project, ground water will be used. End user shall use their individual RO system as per their requirement. All plot owners will be mandatory have ball cock in their water tank to stop overflow and avoid wastage of water.

Sewer System

The sewerage system is an essential part of every human settlement. Since combined sewerage system invariably suffers from the main disadvantage of sluggish flow during most period of the year leading to deposition of sewage solids creating foul and offensive conditions. Hence, sewerage and drainage system shall be proposed separately. Since, it is both difficult and uneconomical to augment the capacity of the sewerage system. Later, the proposed sewers shall be designed for maximum expected discharge to cater the requirement of the ultimate development of the said project. Sewage treatment plan shall be proposed for the treatment of sewage that would generate in the normal housing. Sewage treatment plant process and treat waste water/sewage, breaking it down into a cleaner effluent that can be returned back to nature in a safer, eco-friendly form. They help restore groundwater balance, curb disease and stop degradation and pollution of the environment. Centralized sewerage system shall be provided to reduce the freshwater demand of the project, waste water from the Normal Housing units will be treated in a STP.

Drain

A detailed storm water drainage system and water harvesting procedures are proposed to recharge groundwater. The prime activities for providing drainage system comprises of 1. Internal drainage system 2. Ultimate disposal norms adopted 3. In order to determine total run off, rational formula will be used. 4. Underground water recharge pits with perforated filter media shall be used for Rain water harvesting. 5. Coefficient of runoff shall be adopted as per manual on rain harvesting and conservation.

Parks

There are two parks and open space in the form of park and garden for every age group as per architect plan. There are several instances where the green cover has been reported to reduce the ambience temperature.

Tree Planting

There will be various types of plants as per architect layout. Evergreen plants are proposed to be planted inside the site. Parks shall also be developed by the project prominent. Variety of plants shall be provided for the project in green area.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity board along with transformer, HT panel, LT panel, Feeder pillar and DG back for common service like external lightning, STP, Pump room etc.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Sewage Treatment Plan (STP) will be provided as per architect layout. An sewage network shall collect the sewage and flow by gravity to the proposed sewage treatment plan. Sludge generated from STP shall be rich in organic content and act as excellent fertilizer

Solid Waste Management And Disposal System

There is a proper garbage collection area as per architect layout for solid waste management. Project will adopt systematic approach for solid waste collection and disposal. The solid waste shall be first segregated as plastic, glass, paper, and other waste separately.

Water Conservation System

NA

Energy Management System Including Use of Renewable Energy

NA

Fire Protection And Fire Safety System

NA

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

NA

Other Miscellaneous Work

NA

Documents

Sale Deed

No: Khasra No 373, registered on Book 1, Jild No. 3135, Page No 391 to 420 | Date: 19-06-2002

Sale Deed

No: Khasra No 379, registered on Book 2, Jild No. 3272, Page No 351 to 364 | Date: 28-03-2001

Registry Document

No: Registered Consortium agreement between the promoters | Date: 06-05-2023

Other

Details of Encumbrances

Uploaded: 20-06-2023

Commencement Certificate

Uploaded: 11-07-2023

Other Plan(If Any)

Uploaded: 11-07-2023

Proforma of Application Form

Uploaded: 20-06-2023

Proforma of Allotment Letter

Uploaded: 20-06-2023

Proforma of Conveyance Deed

Uploaded: 20-06-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 21-06-2023

Waste Disposal Plan

Uploaded: 21-06-2023

Water Supply Plan

Uploaded: 21-06-2023

Electricity Supply Plan

Uploaded: 20-06-2023

Development Work Plan

Uploaded: 20-06-2023

Affidavit

Uploaded: 21-06-2023

CA CERTIFICATE

Uploaded: 11-07-2023

ARCHITECT CERTIFICATE

Uploaded: 20-06-2023

ENGINEERS CERTIFICATE

Uploaded: 20-06-2023

Other

Uploaded: 11-07-2023

Permits

Orignal Permit NoPlotted Resi development/Plotted Housing/07156/LDA/LD/22-23/3230/30012023
Orignal Permit Date17-06-2023
Valid Upto16-06-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto16-06-2028
End Date31-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Development by the Promoter itself Spring Garden
Contractor AddressCP 138, 3rd Floor, Viraj Khand, Gomti Nagar, Lucknow-226010
Architect NameMr. Deepankar Sharma
Architect AddressC 2000, Indira Nagar, Lucknow-226016
Architect Licence NumberCA/2014/64728
Structural Engineer NameMr. Arvind Kumar Pandey
Structural Engineer AddressD-2/328, Sector-O, Mansarovar Yojna, LDA Colony, Lucknow-226012
Mobile number(Project Co-ordinator)9919181010

Land Details

Plot

Showing 1 blocks with 4 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

4 units

Khasra Details

Total Area

10260.00

110437.61 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No379
Area(In Sq. Mt.)6980
Khasra
TypeKhasra
Khasra/Plot No373
Area(In Sq. Mt.)3280

Other Details

Contractor Name (if any)Development by the Promoter itself Spring Garden
Contractor AddressCP 138, 3rd Floor, Viraj Khand, Gomti Nagar, Lucknow-226010
Architect NameMr. Deepankar Sharma
Architect AddressC 2000, Indira Nagar, Lucknow-226016
Architect Licence NumberCA/2014/64728
Structural Engineer NameMr. Arvind Kumar Pandey
Structural Engineer AddressD-2/328, Sector-O, Mansarovar Yojna, LDA Colony, Lucknow-226012
Mobile number(Project Co-ordinator)9919181010