Plot is already demarcated all the development and construction work will be done under the demarcated plot.
Brick work boundary wall at the height of 6ft. combination of RCC is proposed around the project as per sanctioned plan.
6.00 mt. wide black top road, aggregate of size 0–10 mm mixed with bitumen forms the base, which is coarse and 150 mm thick. Bitumen, such as cutback bitumen, emulsion, and asphalt, finds application in bitumen mix, tack coat,is proposed around the building as per sanctioned plan.
Footpath shall be with concrete paving and width roper stand and practice in as city.
o Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and control valves are installed to convey water from the main pup station to various parts of the building and site . The distribution network is designed to optimise flow rates, pressure levels, and water quality and builthroughout the system.
A centralised sewer system will be provided, a 300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm dia of the manhole provided as per design of MEP system.
Storm water system will be provided which will be connected to the Municipal drain line as per specified plan.
Not Applicable
Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, 430 V Fidder piller, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
There is no community building proposed in our project.
The S.T.P. treats wastewater from the site to remove contaminants and pollutants before discharge into the environment. Treatment processes may include screening, sedimentation, biological treatment (such as activated sludge or bio filtration), and disinfection to meet regulatory standards and protect public health and the environment.
For Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation.
A well-designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas for energy management system.
o Fire norms shall be followed as per NBC and approval of the fire department. Include smoke detectors, heat detectors, and manual pull stations throughout the building. Centralized monitoring with integration for emergency response. Design: Specify a comprehensive sprinkler system (wet, dry, or pre-action). o Hydraulic Calculations: Conduct calculations for water supply and pressure requirements.
Not applicable
The staircase will provided with emergency exit doors in each floor as per fire department specs
Grand entrance lobby shall be provided.
Showing 1 blocks with 77 units
Total Carpet Area
8575.21 m²
92302.70 ft²
Total Units
85
3 different types
Blocks & Floors
1
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4135.24 m²
44511.31 ft²