Launch Date
Completion Date
RERA ID
26.765107
80.946579
Already well demarcated plot is available for developing area
Boundry wall is constructed .
9.00 mt. approach road from main Lucknow- Raibareilly road . Proper Road Access to the entrance And exit of all the building to be Constructed
Will be Constructed along with internal road
Water supply including drinking water facilities provide threw RCC water tank.
Centralized sewerage system shall be provided. All sewerage water shall be go to the STP.
Storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connected with municipal drain line.
Approved green areas to be maintained as parks with grass cover and shrbs.
Shrubs and plants to be part of green areas.
Electrick pols and transfamer will be installed during Constructing of Towers
Will be Constructed
Sullage water and sewer water will be drained directly in to outer sewers
Solid waste will be collected by concerned authorities
Rain water harvesting / conservation system and other system is to be installed .
Solar Panel is proposed to be installed at roof top of building.
Fire Alarms fire Extinguishers etc will be installed on each and every floor
In very Close Proximity from the site
Emergency exit stairs available as per layout.
Resident club house, swimming pool, CCTV cameras, WIFI, 24/7 Security, Passengers Lift, 24/7 Electricity Supply etc will be installed to the proposed site.
Showing 4 blocks with 22 units
Total Carpet Area
4719.00 m²
50794.84 ft²
Total Units
66
2 different types
Blocks & Floors
4
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2970.00 m²
31968.78 ft²