DEMARCATION OF PLOT IS DONE THROUGH BRICK WORK OF 4.5 INCH IN ZIG -ZAG PATTERN, PLOT SANCTIONED BY MORADABAD DEVLOPMENT AUTHORITY.
EXISTING BOUNDARY WALLS OF 6 FEET HEIGHT AND 9 INCH THICK THROUGHBRICK WORK AND FOUNDATION BRICK WORK OF 4 FEET UNDER THE GROUNDSTARTING WILL FOUNDATION FROM 22 INCH THICKNESS GOING UP TO 18INCH AND THEN 14 INCH AND FINALLY 9 INCH AND COLUMN IN BRICK BOUNDARY WALL AND PLASTER WORK IN INNER SIDE AND PLASTER WORK IN FRONT BOTH SIDE.
9 METER INTERNAL ROAD WILL BE MADE BY RAMMED EARTH AND THEN 150 MTR WBM 40-63 STORE/BAJRA AND THEN 150MM THICK PCC AND THEN 125 MM THICK CONCRETE/RCC.
WILL BE MADE BY RAMMED EARTH AND THAN 100MM WBM 40-63 STONE/BAJRA AND THEM SAND WORK AFTER THAT PAVERS WILL BE INSTALLED.
WATER SUPPLY SHALL BE DONE TILL PARK AREA DRINKING WATER FACILITY TO BE DONE BY RESIDENTS.
SEWER SYSTEM WILL BE MADE UNDER GROUND WHICH CONSIST BY RAMMED EARTH AND THEN 100MM THICK P.C.C AND THEN HDPE PIPES DOUBLE WALL AND THAN PCC.
DRAIN WILL CONSIST OF HDPE PIPES DOUBLE WALL AND MAIN HOLES IN REGULAR INTERVAL.
WATER BODIES/LAND SCAPE AND KIDS PLAY AREA ALONG WITH GREEN AREA WOULD BE DEVELOPED.
PLANTATION PROPOSED AROUND THE PARK AS PER DRAWING.
ELECTICITY SUPPLY SHALL BE DONE THROUGH IRON POLES AS PER THE ELECTRICITY PLANES.
NA
STANDARD STP SYSTEM WITH 40 KLD, SEWAGE LINE WILL BE CONNECTED TO SEWER LINE PROVIDED BY PROMOTER AFTER GETTING TREATED FROM STP.
STP/COMPOSING PIT, SEWAGE LINE WILL BE CONNECTED TO SEWER LINE PROVIDED BY PROMOTER AFTER GETTING TREATED FROM STP.
RAIN HARWESTING PITS AS PER THE DEVELOPMENT NORMS., RAIN WATER HARVESTING WITH CHAMBER 4MT X 4MT AND BORING 300 MM UPTO 300 MT DEPTH FROM GROUND LEVEL.
NA
NA
NA
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
43140.00 m²
464354.65 ft²